Field Supervisor

Field Supervisor completes 20 task examples that represent typical assignments and expected outcomes. The entries show how to prioritize, what to document and common pitfalls. Each one shows where we found it, and comes with an AI prompt you can copy and use straight away.

20evidenced tasks
20ready prompts
9tools of the trade
47-1011.00O*NET-SOC code
812,210hold this job (US, BLS 2025)
$79,920median pay/yr (US)
Open Field Supervisor in the interactive atlas →

What it pays

Government survey numbers — not estimates, not ads.

Half of all First-Line Supervisors of Construction Trades and Extraction Workers in the U.S. earn more than $79,920 a year — the middle 80% land between $53,280 and $128,260. About 812,210 people in the U.S. do this work. Figures are for the U.S. occupation group “First-Line Supervisors of Construction Trades and Extraction Workers”. (U.S. Bureau of Labor Statistics survey, published 2025.) In India, Craft and related trades workers earn about ₹16,825 a month on average — around ₹2.0 lakh a year (government PLFS survey via ILOSTAT, occupation-family figure).
$79,920typical pay / year
812,210people in this work
$128,260+top 10% earn
₹2.0 lakha year in India (family avg)
Think you get this job?Six quick questions on how it really works — with a hint and the reason behind every answer.
Test yourself →

The work, task by task

These are the real jobs-to-be-done, not a wish list. Each task shows where we found it, and the prompt underneath is written for that exact task.

Coordinate3

Supervise and coordinate safety procedures

+
Walk the substation team through the job safety brief for the tower outage tomorrow, document competency…
Walk the substation team through the job safety brief for the tower outage tomorrow, document competency checks, PPE issue, isolation steps and emergency contacts, then upload the signed briefing to the site safety folder and tell the crews to confirm attendance.
The tools that do the workMicrosoft OutlookESCOjob descriptionsO*NET

Estimate material and worker requirements

+
Produce a materials and labour estimate for the next transmission pole replacement: list poles, insulators,…
Produce a materials and labour estimate for the next transmission pole replacement: list poles, insulators, conductors, excavator hours, two linemen per pole for three days, plus contingency 10 percent and deliver to procurement by Wednesday midday.
The tools that do the workMicrosoft Exceljob descriptionsO*NET

Supervise construction or extraction workers

+
Schedule and assign the crew for the stringing job next week, note qualifications required for hot-line work,…
Schedule and assign the crew for the stringing job next week, note qualifications required for hot-line work, set daily targets, record supervisory checks, and circulate the plan with the project foreman and safety officer before Monday shift start.
The tools that do the workProcorejob descriptionsO*NET
The daily work17

Transmission towers

+
Record the damaged tower leg measurements, photos, and GPS coordinates from yesterday’s shift, create a…
Record the damaged tower leg measurements, photos, and GPS coordinates from yesterday’s shift, create a repair priority list with estimated materials and man-hours, and send the packet to procurement and the site foreman by 5pm Friday.
The tools that do the workAutodesk AutoCADESCOsee the evidence ↗

Evaluate employees work

+
Review each crew member’s completed task sheets and photos from the past two weeks, score workmanship against…
Review each crew member’s completed task sheets and photos from the past two weeks, score workmanship against the line-item checklist, flag any safety or quality fails with corrective actions, and circulate the summary to the superintendent by Wednesday noon.
The tools that do the workMicrosoft ExcelMicrosoft OutlookESCOsee the evidence ↗

Ensure compliance with construction project deadline

+
Compare the project baseline schedule to on-site daily reports, list all activities running late with causes…
Compare the project baseline schedule to on-site daily reports, list all activities running late with causes and resource shortfalls, propose recovery steps and revised finish dates, and deliver the update to construction management at the weekly progress meeting.
The tools that do the workOracle Primavera Enterprise Project Portfolio ManagementESCOsee the evidence ↗

Electrical power safety regulations

+
Compile the latest incident logs, equipment inspections, and training records, cross-check them against the…
Compile the latest incident logs, equipment inspections, and training records, cross-check them against the regulatory checklist, highlight any noncompliant items with required remedial actions, and forward the compliance packet to safety and regulatory affairs today.
The tools that do the workAdobe AcrobatESCOsee the evidence ↗

Ensure safety in electrical power operations

+
Walk the active work zones, note unsafe conditions and proximity to live conductors, document corrective…
Walk the active work zones, note unsafe conditions and proximity to live conductors, document corrective measures and required PPE changes, assign crew owners with deadlines, and issue the safety bulletin to all crews before first shift tomorrow.
The tools that do the workMicrosoft WordMicrosoft OutlookESCOsee the evidence ↗

Confer with managerial or technical personnel, other departments, or contractors to resolve problems or to coordinate activities.

+
Talk to Jaime in engineering and Tony from the contractor crew now about the broken insulator on Tower 12,…
Talk to Jaime in engineering and Tony from the contractor crew now about the broken insulator on Tower 12, explain the safety risk, agree who will isolate the phase, which crew will replace the insulator, and set a completion checkpoint by 10:00 tomorrow morning.
The tools that do the workProcoreO*NET

Order or requisition materials or supplies.

+
Place a requisition for eight porcelain suspension insulators, two sets of grounding clamps, and four 3/0…
Place a requisition for eight porcelain suspension insulators, two sets of grounding clamps, and four 3/0 copper jumpers for the southern line, route it to procurement with a delivery request for next Tuesday to avoid schedule delays.
The tools that do the workMicrosoft ExcelO*NET

Arrange for repairs of equipment or machinery.

+
Arrange urgent repairs for the 35 kV hydraulic winch: describe the fault, request on-site diagnostics…
Arrange urgent repairs for the 35 kV hydraulic winch: describe the fault, request on-site diagnostics tomorrow morning, ask the technician to bring spare seals and the spare gearbox, and get a firm ETA so crews are not delayed.
The tools that do the workMicrosoft OutlookO*NET

Record information, such as personnel, production, or operational data on specified forms or reports.

+
Complete the daily field report logging crew names, hours worked, tower tasks completed, safety incidents,…
Complete the daily field report logging crew names, hours worked, tower tasks completed, safety incidents, and materials used, then submit it to payroll and project control before 18:00.
The tools that do the workMicrosoft WordO*NET

Suggest or initiate personnel actions, such as promotions, transfers, or hires.

+
Draft promotion recommendations for Maria and Jamal noting their supervisory performance, clearance of safety…
Draft promotion recommendations for Maria and Jamal noting their supervisory performance, clearance of safety infractions, and certification dates, then meet with HR on Friday to discuss transfers or pay adjustments.
The tools that do the workMicrosoft WordO*NET

Coordinate work activities with other project teams

+
Synchronize work with the civil crew and the stringing team for next Monday: confirm who holds outages,…
Synchronize work with the civil crew and the stringing team for next Monday: confirm who holds outages, sequence tower work, share the safety plan, and set a joint briefing for 07:00 on site so nobody overlaps critical lifts.
The tools that do the workMicrosoft Projectjob descriptions

Schedule construction or extraction activities

+
Schedule tower crew outages, equipment deliveries and excavation windows for the next two weeks so line…
Schedule tower crew outages, equipment deliveries and excavation windows for the next two weeks so line replacement, pull tests and pad pours finish by June 30; confirm worker certifications and include two-hour contingency for weather delays.
The tools that do the workMicrosoft Projectjob descriptions

Discuss problems with managers and contractors

+
Set a meeting with construction managers and the lead contractor to walk through yesterday’s grounding…
Set a meeting with construction managers and the lead contractor to walk through yesterday’s grounding failure, outline safety gaps, assign corrective owners, and get verbal agreement on resources and a written remediation plan by Wednesday afternoon.
The tools that do the workMicrosoft Outlookjob descriptions

Read blueprints and specifications

+
Review the transmission tower erection drawings and the method statement, flag any discrepancy between…
Review the transmission tower erection drawings and the method statement, flag any discrepancy between foundation depths and site soils, note required torque on anchor bolts, and produce a one-page instructions sheet for crews before first lift tomorrow morning.
The tools that do the workAutodesk AutoCADjob descriptions

Assign tasks

+
Assign tomorrow’s crews: give the rigging team tower A install and anchor bolt torque checks, the cable crew…
Assign tomorrow’s crews: give the rigging team tower A install and anchor bolt torque checks, the cable crew stringing between towers B and C, and the safety lead the daily permit review; record task owners and expected completion times for my end-of-day report.
The tools that do the workProcoreESCO

Take quick decisions to resolve problems

+
Authorize an immediate temporary de-energization and isolating of the span where we detected arcing, order…
Authorize an immediate temporary de-energization and isolating of the span where we detected arcing, order insulated tools and a qualified lineman standby, and notify operations control and the safety officer before work resumes.
The tools that do the workMicrosoft OfficeESCO

Electrical discharge

+
Perform a controlled electrical discharge test on the de-energized section, verify clearance distances and…
Perform a controlled electrical discharge test on the de-energized section, verify clearance distances and surge grounding per procedure, document readings and any anomalies, and sign off the permit before re-energizing at shift end.
The tools that do the workMicrosoft ExcelESCOsee the evidence ↗

Says who?

These are the pages we read to build this. Open any of them and check us.

The logs, files & records this job keeps

Shared with other careers — the same record means something different in each.

Related careers

Same family of work — each with its own tasks and prompts.

The LLOS Work Atlas is the world's largest evidenced task library — a map of human work, with a ready prompt behind every task. 1,774 careers · every task named by the sources that witnessed it — O*NET, ESCO, real job descriptions, Wikipedia — and the deepest tasks by several at once. And it is honest about limits: where AI cannot help, the map says so.

The rest of the map

Same library, five ways in.