What it pays
Government survey numbers — not estimates, not ads.
Half of all Social Scientists and Related Workers, All Other in the U.S. earn more than $101,110 a year — the middle 80% land between $66,120 and $160,300. About 37,100 people in the U.S. do this work. Figures are for the U.S. occupation group “Social Scientists and Related Workers, All Other”. (U.S. Bureau of Labor Statistics survey, published 2025.) In India, Professionals earn about ₹38,298 a month on average — around ₹4.6 lakh a year (government PLFS survey via ILOSTAT, occupation-family figure).
$101,110typical pay / year
37,100people in this work
$160,300+top 10% earn
₹4.6 lakha year in India (family avg)
Think you get this job?Six quick questions on how it really works — with a hint and the reason behind every answer.
Test yourself →The work, task by task
These are the real jobs-to-be-done, not a wish list. Each task shows where we found it, and the prompt underneath is written for that exact task.
Analysing2
Develop transportation models or simulations
+Build a regional transport simulation of peak-hour flows that tests a new bus corridor and junction changes,…
Develop transportation models or simulations
+Build a regional transport simulation of peak-hour flows that tests a new bus corridor and junction changes, quantifies delays and emissions under three scenarios, and produce tables and charts for the environmental impact statement due September 10.
The tools that do the workAutodesk AutoCAD Civil 3DESRI ArcGISjob descriptionsO*NETWikipedia
Pasted it? Good. When the reply comes back, push once: ask it to sharpen the weakest part. — Did this prompt help?
Define regional or local transportation planning problems
+Prepare a problem statement and evidence memo defining why cross-town freight delays are worsening in the…
Define regional or local transportation planning problems
+Prepare a problem statement and evidence memo defining why cross-town freight delays are worsening in the northern subregion, include traffic counts, land-use changes, and statutory constraints to guide the policy workshop on Friday.
The tools that do the workESRI ArcGISIBM SPSS Statisticsjob descriptionsO*NET
Pasted it? Good. When the reply comes back, push once: ask it to sharpen the weakest part. — Did this prompt help?
Make1
Improve transport systems
+Produce a concise package of route-level and network-wide changes to reduce congestion on Elm and River…
Improve transport systems
+Produce a concise package of route-level and network-wide changes to reduce congestion on Elm and River corridors, showing projected vehicle-km reduction, revised bus priority lanes, and new signal timing proposals for council review next Tuesday.
The tools that do the workESRI ArcGISMicrosoft ExcelESCOjob descriptionsO*NET
Pasted it? Good. When the reply comes back, push once: ask it to sharpen the weakest part. — Did this prompt help?
Keeping the record1
Collect traffic data
+Design and schedule a two-week roadside and video count campaign on Oak Avenue and Pine Street to capture…
Collect traffic data
+Design and schedule a two-week roadside and video count campaign on Oak Avenue and Pine Street to capture AM/PM peak turning movements, include sample sheets, survey roles, and an hourly deployment roster for Tuesday start.
The tools that do the workMicrosoft ExcelESRI ArcGISESCOjob descriptionsO*NET
Pasted it? Good. When the reply comes back, push once: ask it to sharpen the weakest part. — Did this prompt help?
Get approval2
Participate in public meetings or hearings
+Draft a five-minute presentation and a one-page Q&A for Wednesday's community hearing on the proposed Maple…
Participate in public meetings or hearings
+Draft a five-minute presentation and a one-page Q&A for Wednesday's community hearing on the proposed Maple bike lane, emphasising safety evidence, legal rights-of-way, and concise responses to anticipated resident objections.
The tools that do the workESRI ArcGISjob descriptionsO*NET
Pasted it? Good. When the reply comes back, push once: ask it to sharpen the weakest part. — Did this prompt help?
Represent jurisdictions in land development approvals
+Draft my formal comment on the Lakeside Estates subdivision application to protect arterial capacity: list…
Represent jurisdictions in land development approvals
+Draft my formal comment on the Lakeside Estates subdivision application to protect arterial capacity: list required road dedications, intersection upgrades, and mitigation conditions tied to traffic impact study findings for the planning board meeting Monday.
The tools that do the workAutodesk AutoCAD Civil 3DMicrosoft Officejob descriptionsO*NET
Pasted it? Good. When the reply comes back, push once: ask it to sharpen the weakest part. — Did this prompt help?
The daily work14
Maintain certification through professional development
+Log my completed webinars and workshops from this quarter, attach the certificates and attendance records,…
Maintain certification through professional development
+Log my completed webinars and workshops from this quarter, attach the certificates and attendance records, calculate the professional development hours, then submit the package to HR by Friday so my certification renewal file is up to date.
The tools that do the workMicrosoft OfficeWikipedia
Pasted it? Good. When the reply comes back, push once: ask it to sharpen the weakest part. — Did this prompt help?
Develop and implement policies
+Draft the new curbside loading and parking policy, include data-backed justification from last year’s counts,…
Develop and implement policies
+Draft the new curbside loading and parking policy, include data-backed justification from last year’s counts, circulate the draft to legal and the neighbourhood liaison, and schedule a February 14 adoption briefing with the council clerk.
The tools that do the workESRI ArcGISMicrosoft OfficeESCO
Pasted it? Good. When the reply comes back, push once: ask it to sharpen the weakest part. — Did this prompt help?
Regulate traffic
+Revise the traffic signal timing plan for Main and 5th using the latest peak hour counts, produce updated…
Regulate traffic
+Revise the traffic signal timing plan for Main and 5th using the latest peak hour counts, produce updated turning-movement diagrams and a mitigation memo, then send the package to the traffic operations supervisor for implementation next Monday.
Pasted it? Good. When the reply comes back, push once: ask it to sharpen the weakest part. — Did this prompt help?
Conduct environmental surveys
+Compile the coastal wetland impact survey, geolocate every sample point, write the methodology and findings,…
Conduct environmental surveys
+Compile the coastal wetland impact survey, geolocate every sample point, write the methodology and findings, attach photos and field notes, then submit the report to the environmental compliance officer by Wednesday.
Pasted it? Good. When the reply comes back, push once: ask it to sharpen the weakest part. — Did this prompt help?
Public law
+Prepare the legal memorandum interpreting the city’s right-of-way statute for the upcoming appeal, cite…
Public law
+Prepare the legal memorandum interpreting the city’s right-of-way statute for the upcoming appeal, cite recent case law, flag any exposure for the department, and email it to the city solicitor and my director by Tuesday noon.
Pasted it? Good. When the reply comes back, push once: ask it to sharpen the weakest part. — Did this prompt help?
Environmental legislation
+Draft an implementation note translating the new state environmental mitigation rule into local permit…
Environmental legislation
+Draft an implementation note translating the new state environmental mitigation rule into local permit conditions, list required monitoring, cost estimates, and a rollout timeline, then send it to permits and finance for signoff by next Friday.
Pasted it? Good. When the reply comes back, push once: ask it to sharpen the weakest part. — Did this prompt help?
Prepare environmental documents such as impact statements
+Draft the environmental impact statement for the North River bridge replacement, include purpose and need,…
Prepare environmental documents such as impact statements
+Draft the environmental impact statement for the North River bridge replacement, include purpose and need, alternatives considered, affected environment, anticipated traffic and air quality impacts, and append survey photos and species lists so it's review-ready for the regional permit team by next Wednesday.
The tools that do the workESRI ArcGISAdobe Acrobatjob descriptionsO*NET
Pasted it? Good. When the reply comes back, push once: ask it to sharpen the weakest part. — Did this prompt help?
Prepare or review engineering studies or specifications.
+Review the Geotech and pavement structural report for Elm Street reconstruction, confirm design assumptions,…
Prepare or review engineering studies or specifications.
+Review the Geotech and pavement structural report for Elm Street reconstruction, confirm design assumptions, check traffic loading, update quantities and clear discrepancies with the design engineer, then issue consolidated comments to procurement and the design team by Friday noon.
The tools that do the workAutodesk AutoCAD Civil 3DMicrosoft ExcelO*NET
Pasted it? Good. When the reply comes back, push once: ask it to sharpen the weakest part. — Did this prompt help?
Define or update information such as urban boundaries or classification of roadways.
+Update the urban growth boundary and road functional classification map to reflect the 2026 zoning changes,…
Define or update information such as urban boundaries or classification of roadways.
+Update the urban growth boundary and road functional classification map to reflect the 2026 zoning changes, reclassify the three new collector streets, produce a change log, and circulate the map and summary to the city planning director and MPO mapping team by Tuesday.
The tools that do the workESRI ArcGISO*NET
Pasted it? Good. When the reply comes back, push once: ask it to sharpen the weakest part. — Did this prompt help?
Study transportation system use and operation
+Analyze last quarter's travel counts and signal performance along Corridor 7, produce peak hour…
Study transportation system use and operation
+Analyze last quarter's travel counts and signal performance along Corridor 7, produce peak hour origin–destination summaries, identify recurring congestion points and probable causes, and send a one-page memo with recommended short-term operations adjustments to the traffic operations supervisor by Monday morning.
The tools that do the workIBM SPSS StatisticsMicrosoft Exceljob descriptions
Pasted it? Good. When the reply comes back, push once: ask it to sharpen the weakest part. — Did this prompt help?
Manage planning and corridor projects
+Prepare the schedule, stakeholder contact list, funding milestones and risk register for the Route 12…
Manage planning and corridor projects
+Prepare the schedule, stakeholder contact list, funding milestones and risk register for the Route 12 corridor study, assign lead for environmental screening, and circulate the draft project management plan to the county director and funding agency by Friday close of business.
The tools that do the workMicrosoft Officejob descriptions
Pasted it? Good. When the reply comes back, push once: ask it to sharpen the weakest part. — Did this prompt help?
Write project plans, research findings, and proposals
+Write the draft grant proposal and technical appendix for the Safe Routes to School study, summarise data…
Write project plans, research findings, and proposals
+Write the draft grant proposal and technical appendix for the Safe Routes to School study, summarise data methods, present six-month deliverables and budget lines, include community engagement plan, and submit the packet to grants@county.gov for internal review by next Tuesday.
The tools that do the workMicrosoft OfficeMicrosoft Exceljob descriptions
Pasted it? Good. When the reply comes back, push once: ask it to sharpen the weakest part. — Did this prompt help?
Statistical analysis system software
+Run the traffic count dataset through the statistical analysis system, test the model residuals for…
Statistical analysis system software
+Run the traffic count dataset through the statistical analysis system, test the model residuals for heteroskedasticity and autocorrelation, produce significance tables for peak-hour flows and elasticities, and flag any missing or implausible records before I review.
Pasted it? Good. When the reply comes back, push once: ask it to sharpen the weakest part. — Did this prompt help?
Report analysis results
+Draft the analysis results into the technical report: summarise peak-hour flow findings, include the…
Report analysis results
+Draft the analysis results into the technical report: summarise peak-hour flow findings, include the significance tables and confidence intervals, explain implications for the proposed signal timing and mitigation, and prepare the figures and appendix for peer review.
Pasted it? Good. When the reply comes back, push once: ask it to sharpen the weakest part. — Did this prompt help?
Says who?
These are the pages we read to build this. Open any of them and check us.
The logs, files & records this job keeps
Shared with other careers — the same record means something different in each.
Related careers
Same family of work — each with its own tasks and prompts.
The LLOS Work Atlas is the world's largest evidenced task library — a map of human work, with a ready prompt behind every task. 1,774 careers · every task named by the sources that witnessed it — O*NET, ESCO, real job descriptions, Wikipedia — and the deepest tasks by several at once. And it is honest about limits: where AI cannot help, the map says so.
The rest of the map
Same library, five ways in.
Copyright © LLOS.ai · 2026 — original pedagogy, voice, and design — all rights reserved.
Built on public evidence: O*NET®, ESCO, Wikipedia, U.S. Bureau of Labor Statistics, ILOSTAT. All sources & licenses
Built on public evidence: O*NET®, ESCO, Wikipedia, U.S. Bureau of Labor Statistics, ILOSTAT. All sources & licenses