Calculate design specifications or cost, material, and resource estimates, and prepare project schedules and budgets.

Calculate design specifications or cost, material, and resource estimates, and prepare project schedules and budgets. in Microsoft Excel — with the four heights of help laid out: do it now, make it easier for the next person to accept, work out the right move when you are stuck, and learn the pattern so it stops coming back.

4prompt heights
Open it in the interactive atlas →

The four heights

The same task, four distances: today's deadline, the next reviewer, the stuck moment, the pattern.

Execute — do the immediate task

+
I have to send the preliminary cost estimate and schedule for the retrofit project at 412 Dock…
I have to send the preliminary cost estimate and schedule for the retrofit project at 412 Dock Street to the project manager and the client on Friday. Open the design estimate workbook, confirm material unit rates for steel and insulation match last month's procurement sheet, update labor hours for the revised sequence, recalc totals so the contingency shows correctly, and attach the PDF estimate to an email to Javier in projects and to Priya in client services.

Improve — make it easier to accept

+
Before I send the estimate to Javier and Priya, make it easy to approve: put the total cost and…
Before I send the estimate to Javier and Priya, make it easy to approve: put the total cost and schedule summary on the first sheet, list the top three cost drivers with their line-item references, make pricing lines searchable, and flag any assumptions that would make a reviewer hesitate — for example 'lead time 8–10 weeks' or 'site access limited'.

Decide — diagnose the stuck moment

+
I just received an email from Priya asking for a firm price and schedule for the dock retrofit, but…

The client asked for a quicker turnaround on cost but I haven't verified lead times.

I just received an email from Priya asking for a firm price and schedule for the dock retrofit, but the supplier replies on steel lead times are unclear and my contractor hasn't committed labor rates. I'm worried giving a number will lock us into unrealistic dates or costs. I cannot tell Priya the uncertainty without seeming unprepared. Should I provide a provisional estimate with clear assumptions and an ask for two-week leeway, or hold until rates are nailed down?

Become — change the pattern

+
On virtually every retrofit estimate I chase suppliers and contractors the day before a client…

We routinely scramble to confirm supplier lead times at the last minute.

On virtually every retrofit estimate I chase suppliers and contractors the day before a client deadline, which forces last-minute changes and damages our reputation for reliable schedules. What process change or habit would prevent that recurring scramble so lead times and labor rates are confirmed earlier in the estimate cycle?

Next to this one

Other Microsoft Excel work people do in Microsoft Excel.

Every task here came from the work, not from a feature list — which is why the prompts name what you want done and never the button that does it. The tool changes; the work does not.