Define routing for manufacturing

Define routing for manufacturing in SAP — with the four heights of help laid out: do it now, make it easier for the next person to accept, work out the right move when you are stuck, and learn the pattern so it stops coming back.

4prompt heights
Open it in the interactive atlas →

The four heights

The same task, four distances: today's deadline, the next reviewer, the stuck moment, the pattern.

Execute — do the immediate task

+
We need routings ready for next week's job schedule. Send the new routing draft to Lin in process…
We need routings ready for next week's job schedule. Send the new routing draft to Lin in process engineering and then to Javier on the shop floor for practical sign-off, due by Wednesday noon; verify cycle times, tooling requirements, and work center capacity before routing is issued.

Improve — make it easier to accept

+
Before I hand this routing to production, make it easy to approve: show total takt time up front,…
Before I hand this routing to production, make it easy to approve: show total takt time up front, list critical operations and required fixtures, call out any operations that need overtime or external services, and flag steps where the standard time differs from historical averages.

Decide — diagnose the stuck moment

+
The updated routing I received increases cycle time by 30% without adding operations. I own…

A new routing shows a 30% longer cycle but no extra operations

The updated routing I received increases cycle time by 30% without adding operations. I own routings and capacity plans; Lin authored the routing and shop floor supervisors will be blamed if schedules slip. I'm not sure whether times are inflated to pad capacity or if setup steps were merged. What's the best way to validate the extra time quickly and who should I pull in to avoid a schedule hit?

Become — change the pattern

+
Over the past quarters routings are repeatedly changed late, causing downtime and overtime. I…

Routings repeatedly require emergency changes just before production

Over the past quarters routings are repeatedly changed late, causing downtime and overtime. I coordinate routings, process engineering drives changes, and supervisors push back at the last minute. Which recurring habit causes the most rework — ignoring operator feedback, skipping pilot runs, or approving without capacity checks — and what single change will cut these emergencies most effectively?

Next to this one

Other enterprise resource planning work people do in SAP.

Every task here came from the work, not from a feature list — which is why the prompts name what you want done and never the button that does it. The tool changes; the work does not.
Copyright © LLOS.ai · 2026 — original pedagogy, voice, and design — all rights reserved.

The rest of the map

Same library, five ways in.