Execute feasibility study

Execute feasibility study — real work, not an imagined feature: named inside 4 evidenced career tasks. Below are four ready AI prompts for it, one per height of help: do it, make it easier to accept, decide when you are stuck, and change the pattern for good.

4career tasks name it
4prompt heights

The four heights

The same task, four distances: today's deadline, the next reviewer, the stuck moment, the pattern.

Execute — do the immediate task

+
I must deliver a feasibility study first draft on the solar microgrid for the remote comms site by…
I must deliver a feasibility study first draft on the solar microgrid for the remote comms site by Friday so leadership can review caps. Prepare a workbook that lays out capital cost, O&M, estimated generation by month, payback period, and three sensitivity runs for load growth and panel degradation. Tie assumptions to named quotes from SolarCo and an estimated crew mobilization cost. Label the executive summary numbers clearly for the Friday review. Ladder L1

Improve — make it easier to accept

+
Before I send the draft to Emma in strategy and Tom the CFO, make approval easy: surface net…
Before I send the draft to Emma in strategy and Tom the CFO, make approval easy: surface net present value and simple payback at the top, put the two assumptions that would make Tom say no (battery replacement cost and fuel-offset rate) in a flagged box, and make the months with lowest generation obvious. Add a short line about regulatory permitting that could add 60–90 days. Ladder L2

Decide — diagnose the stuck moment

+
I ran three sensitivity scenarios and a small change in battery replacement cost pushes NPV from…

Sensitivity runs flip the project from positive to negative NPV

I ran three sensitivity scenarios and a small change in battery replacement cost pushes NPV from positive to negative. Stakeholders: me, Emma in strategy who wants to proceed, and Tom the CFO who needs certainty. I'm afraid presenting the model as-is will get the project killed. I don't know whether to tighten battery cost sourcing, add a contingency, or change the financing term. Which single adjustment is the most defensible to present now that will preserve credibility and why? Ladder L5

Become — change the pattern

+
Across the last four feasibility studies we lose weeks because every stakeholder asks for a new…

Feasibility studies get stuck in endless 'what-if' permutations

Across the last four feasibility studies we lose weeks because every stakeholder asks for a new scenario and we hand-craft each variant. I want one habit change to stop scope creep: what baseline scenario and governance rule should we set so studies are decisionable in two iterations, and what two sensitivity knobs must always be included? Be concrete. Ladder L6

Where the evidence lives

Who was seen doing this, and what people really ask.

Software tasks in the LLOS Work Atlas come from evidence, never a feature list: careers attested to do the work, real job descriptions, and the questions people actually ask (with their view counts). Facets — feature, workflow, troubleshoot, administer, deploy, scale — are open metadata: the work decides, not a taxonomy.
Copyright © LLOS.ai · 2026 — original pedagogy, voice, and design — all rights reserved.

The rest of the map

Same library, five ways in.