What it pays
Government survey numbers — not estimates, not ads.
Half of all Electrical and Electronic Engineering Technologists and Technicians in the U.S. earn more than $78,190 a year — the middle 80% land between $49,510 and $115,700. About 95,130 people in the U.S. do this work. Figures are for the U.S. occupation group “Electrical and Electronic Engineering Technologists and Technicians”. (U.S. Bureau of Labor Statistics survey, published 2025.) In India, Professionals earn about ₹38,298 a month on average — around ₹4.6 lakh a year (government PLFS survey via ILOSTAT, occupation-family figure).
$78,190typical pay / year
95,130people in this work
$115,700+top 10% earn
₹4.6 lakha year in India (family avg)
Think you get this job?Six quick questions on how it really works — with a hint and the reason behind every answer.
Test yourself →The work, task by task
These are the real jobs-to-be-done, not a wish list. Each task shows where we found it, and the prompt underneath is written for that exact task.
Fixing1
Replace defective components or parts
+Document and schedule replacement of the failed HVAC control module and two relay assemblies: record measured…
Replace defective components or parts
+Document and schedule replacement of the failed HVAC control module and two relay assemblies: record measured voltages, attach as-built panel elevations, create parts list with supplier codes and estimated lead times, and issue the work order to procurement today.
The tools that do the workAutodesk RevitMicrosoft Exceljob descriptionsO*NETWikipedia
Pasted it? Good. When the reply comes back, push once: ask it to sharpen the weakest part. — Did this prompt help?
Analysing2
Apply electrical and electronic theory and knowledge
+Calculate expected load on the lighting circuits for the east atrium, measure and log circuit voltages and…
Apply electrical and electronic theory and knowledge
+Calculate expected load on the lighting circuits for the east atrium, measure and log circuit voltages and harmonics, update the wiring diagram to reflect corrected feeder sizing, and attach the test results to the electrical compliance record before handover.
The tools that do the workAutodesk AutoCADMicrosoft ExcelESCOjob descriptionsWikipedia
Pasted it? Good. When the reply comes back, push once: ask it to sharpen the weakest part. — Did this prompt help?
Aid in testing electrical devices and facilities
+Test the new lighting panels and socket circuits in Block B level 2 today, record voltage, current and…
Aid in testing electrical devices and facilities
+Test the new lighting panels and socket circuits in Block B level 2 today, record voltage, current and insulation resistance readings, flag any readings outside manufacturer limits, photograph faulty terminations, and file a signed test report before 17:00 for Rowan in facilities.
The tools that do the workMicrosoft ExcelESCOWikipedia
Pasted it? Good. When the reply comes back, push once: ask it to sharpen the weakest part. — Did this prompt help?
Keeping the record2
Draw diagrams and write specifications
+Produce single-line diagrams and component specifications for the building distribution board, include cable…
Draw diagrams and write specifications
+Produce single-line diagrams and component specifications for the building distribution board, include cable schedules, protective device settings, and test point locations, then draft the specification section for the tender package to issue Monday.
The tools that do the workAutodesk AutoCADMicrosoft OfficeESCOjob descriptionsO*NET
Pasted it? Good. When the reply comes back, push once: ask it to sharpen the weakest part. — Did this prompt help?
Ensure compliance with electrical safety standards
+Review the electrical installation drawings against BS 7671, mark non-conformances on the schematics, produce…
Ensure compliance with electrical safety standards
+Review the electrical installation drawings against BS 7671, mark non-conformances on the schematics, produce a rectification plan with priority items and test regimes, and submit the compliance report to the project safety lead by Thursday.
The tools that do the workAutodesk RevitMicrosoft ExcelO*NETWikipedia
Pasted it? Good. When the reply comes back, push once: ask it to sharpen the weakest part. — Did this prompt help?
Make1
Assemble electrical and electronic systems and prototypes
+Assemble the prototype control rack for the lobby display, wire the power supply and signal board, bench-test…
Assemble electrical and electronic systems and prototypes
+Assemble the prototype control rack for the lobby display, wire the power supply and signal board, bench-test each module to design currents and document wiring changes with annotated drawings, then hand the prototype to Marcus in production for fit trials tomorrow morning.
The tools that do the workDassault Systemes SolidWorksMicrosoft Exceljob descriptionsO*NET
Pasted it? Good. When the reply comes back, push once: ask it to sharpen the weakest part. — Did this prompt help?
The daily work16
Set up and operate test equipment
+Set up the multimeter, oscilloscope and power supply in bay B3, verify wiring against the last issued site…
Set up and operate test equipment
+Set up the multimeter, oscilloscope and power supply in bay B3, verify wiring against the last issued site drawing, run the standard test sequence recording voltage, current and waveform samples, and log failures to the test report before 16:00 Friday.
The tools that do the workLinuxjob descriptionsO*NET
Pasted it? Good. When the reply comes back, push once: ask it to sharpen the weakest part. — Did this prompt help?
Support the integration of electronic components into systems
+Lay out the control board in the system harness drawing, check pinouts and mounting clearances against the…
Support the integration of electronic components into systems
+Lay out the control board in the system harness drawing, check pinouts and mounting clearances against the enclosure cut‑outs, draft the integration note showing sensor connections and supply rails, and send it to the electronics engineer and site installer by Wednesday.
The tools that do the workAutodesk RevitMicrosoft ExcelO*NETWikipedia
Pasted it? Good. When the reply comes back, push once: ask it to sharpen the weakest part. — Did this prompt help?
Identify solutions to technical design problems
+Walk the conflict in the north stair core where the ventilation duct crosses the lighting tray, sketch three…
Identify solutions to technical design problems
+Walk the conflict in the north stair core where the ventilation duct crosses the lighting tray, sketch three clearance options with implications for wiring and fire routes, recommend the least disruptive fix for the architect and M&E lead tomorrow morning.
The tools that do the workAutodesk AutoCADjob descriptionsO*NET
Pasted it? Good. When the reply comes back, push once: ask it to sharpen the weakest part. — Did this prompt help?
Calculate design specifications or cost, material, and resource estimates, and prepare project schedules and budgets.
+Extract quantities from the latest construction drawing set, price the listed materials and labour rates,…
Calculate design specifications or cost, material, and resource estimates, and prepare project schedules and budgets.
+Extract quantities from the latest construction drawing set, price the listed materials and labour rates, build a four‑month cashflow and cost summary, then circulate the budget and schedule to the project manager and commercial lead for review by Friday noon.
The tools that do the workMicrosoft ExcelMicrosoft OfficeO*NET
Pasted it? Good. When the reply comes back, push once: ask it to sharpen the weakest part. — Did this prompt help?
Participate in training or continuing education activities to stay abreast of engineering or industry advances.
+Book the three‑hour module on low‑voltage installations and the afternoon CAD update session, add them to my…
Participate in training or continuing education activities to stay abreast of engineering or industry advances.
+Book the three‑hour module on low‑voltage installations and the afternoon CAD update session, add them to my calendar, download the course notes, and send a short learning objective note to the team asking for any related issues to bring up.
The tools that do the workMicrosoft OfficeO*NET
Pasted it? Good. When the reply comes back, push once: ask it to sharpen the weakest part. — Did this prompt help?
Research equipment or component needs, sources, competitive prices, delivery times, or ongoing operational costs.
+Compile a supplier comparison for the specified control panels: list vendors, lead times, unit prices,…
Research equipment or component needs, sources, competitive prices, delivery times, or ongoing operational costs.
+Compile a supplier comparison for the specified control panels: list vendors, lead times, unit prices, warranty terms and estimated lifetime running costs, flag any single‑source risks, and send recommendations to procurement and the project director by Tuesday.
The tools that do the workMicrosoft ExcelO*NET
Pasted it? Good. When the reply comes back, push once: ask it to sharpen the weakest part. — Did this prompt help?
Review, develop, or prepare maintenance standards.
+Write clear maintenance standards for the 10-storey residential block on King Street: define inspection…
Review, develop, or prepare maintenance standards.
+Write clear maintenance standards for the 10-storey residential block on King Street: define inspection intervals, acceptance criteria for façade, MEP and roof elements, required test methods and record templates, and circulate the draft to Claire in FM by Friday.
The tools that do the workMicrosoft OfficeO*NET
Pasted it? Good. When the reply comes back, push once: ask it to sharpen the weakest part. — Did this prompt help?
Conduct statistical studies to analyze or compare production costs for sustainable or nonsustainable designs.
+Run a cost comparison of two façade systems for the new office scheme: compile material, installation and…
Conduct statistical studies to analyze or compare production costs for sustainable or nonsustainable designs.
+Run a cost comparison of two façade systems for the new office scheme: compile material, installation and lifecycle energy costs for the aluminium curtain wall and the glazed timber option, calculate net present value over 30 years, and produce a one-page recommendation for Sarah in Sustainability.
The tools that do the workMicrosoft ExcelMicrosoft OfficeO*NET
Pasted it? Good. When the reply comes back, push once: ask it to sharpen the weakest part. — Did this prompt help?
Use mathematics for analysis, design, and troubleshooting
+Analyse the structural thermal bridging at the corner detail: calculate heat loss, required insulation…
Use mathematics for analysis, design, and troubleshooting
+Analyse the structural thermal bridging at the corner detail: calculate heat loss, required insulation thickness, and maximum U-value to meet Part L, then produce annotated detail drawings and a short note for the engineer, due Tuesday.
The tools that do the workAutodesk AutoCADjob descriptions
Pasted it? Good. When the reply comes back, push once: ask it to sharpen the weakest part. — Did this prompt help?
Help plan and develop communications equipment
+Develop the rooftop telecommunications support layout: determine cable routes, antenna mounting points, power…
Help plan and develop communications equipment
+Develop the rooftop telecommunications support layout: determine cable routes, antenna mounting points, power supply and earthing arrangements, produce a coordinated layout and specification, and send to the RF installer and Paul the electrical lead for review.
The tools that do the workAutodesk Revitjob descriptions
Pasted it? Good. When the reply comes back, push once: ask it to sharpen the weakest part. — Did this prompt help?
Assist in product evaluation and testing
+Run the product evaluation for the new LED downlight: prepare test schedule for lumen output, glare, power…
Assist in product evaluation and testing
+Run the product evaluation for the new LED downlight: prepare test schedule for lumen output, glare, power draw and thermal performance, record results against manufacturer claims, and write a pass/fail report for procurement and Jane in Lighting Design.
The tools that do the workMicrosoft Exceljob descriptions
Pasted it? Good. When the reply comes back, push once: ask it to sharpen the weakest part. — Did this prompt help?
Visit sites to observe conditions affecting design
+Carry out the site visit to 45 Riverside to check existing services and daylighting constraints: take…
Visit sites to observe conditions affecting design
+Carry out the site visit to 45 Riverside to check existing services and daylighting constraints: take measured photos, record clearances and service routes, note variations from drawings, log safety hazards, and upload a one-page site observation to the project folder for Mihir.
The tools that do the workAdobe Acrobatjob descriptions
Pasted it? Good. When the reply comes back, push once: ask it to sharpen the weakest part. — Did this prompt help?
Inspect designs for quality control
+Review the issued construction drawings and mark every non-compliant detail or missing tag against the…
Inspect designs for quality control
+Review the issued construction drawings and mark every non-compliant detail or missing tag against the specification, measure critical conduit and panel dimensions on the drawings, then produce a QC report for the design manager by Wednesday.
The tools that do the workAutodesk Revitjob descriptions
Pasted it? Good. When the reply comes back, push once: ask it to sharpen the weakest part. — Did this prompt help?
Build prototypes from plans or sketches
+Translate the sketch pack into a measurable prototype set, create dimensioned component drawings, flag any…
Build prototypes from plans or sketches
+Translate the sketch pack into a measurable prototype set, create dimensioned component drawings, flag any unclear junctions for the architect, and produce a parts list and assembly sequence for the workshop by next Tuesday.
The tools that do the workAutodesk AutoCADjob descriptions
Pasted it? Good. When the reply comes back, push once: ask it to sharpen the weakest part. — Did this prompt help?
Perform technical tasks
+Carry out the technical checks on the latest detail bundle: verify plate and fastener sizes, confirm…
Perform technical tasks
+Carry out the technical checks on the latest detail bundle: verify plate and fastener sizes, confirm clearances on electrical runs, update any detail drawings with correction notes, and log remaining technical queries for the engineer before Friday.
The tools that do the workMicrosoft ExcelESCO
Pasted it? Good. When the reply comes back, push once: ask it to sharpen the weakest part. — Did this prompt help?
Aid in operation of electrical devices and facilities
+Support site operations by testing and recording voltage and continuity readings on the panel schedule,…
Aid in operation of electrical devices and facilities
+Support site operations by testing and recording voltage and continuity readings on the panel schedule, confirm tag locations against the as-built drawings, and hand over a signed inspection sheet to the facilities manager today.
The tools that do the workMicrosoft OfficeESCO
Pasted it? Good. When the reply comes back, push once: ask it to sharpen the weakest part. — Did this prompt help?
Says who?
These are the pages we read to build this. Open any of them and check us.
The logs, files & records this job keeps
Shared with other careers — the same record means something different in each.
Related careers
Same family of work — each with its own tasks and prompts.
The LLOS Work Atlas is the world's largest evidenced task library — a map of human work, with a ready prompt behind every task. 1,774 careers · every task named by the sources that witnessed it — O*NET, ESCO, real job descriptions, Wikipedia — and the deepest tasks by several at once. And it is honest about limits: where AI cannot help, the map says so.
The rest of the map
Same library, five ways in.
Copyright © LLOS.ai · 2026 — original pedagogy, voice, and design — all rights reserved.
Built on public evidence: O*NET®, ESCO, Wikipedia, U.S. Bureau of Labor Statistics, ILOSTAT. All sources & licenses
Built on public evidence: O*NET®, ESCO, Wikipedia, U.S. Bureau of Labor Statistics, ILOSTAT. All sources & licenses