High Voltage Lineman

High Voltage Lineman provides hands-on help and checks outcomes with 20 realistic tasks drawn from the field. The tasks reveal typical rhythms, possible surprises, and what beginners should practice first. Each one shows where we found it, and comes with an AI prompt you can copy and use straight away.

20evidenced tasks
20ready prompts
7tools of the trade
49-9051.00O*NET-SOC code
131,070hold this job (US, BLS 2025)
$95,320median pay/yr (US)
Open High Voltage Lineman in the interactive atlas →

What it pays

Government survey numbers — not estimates, not ads.

Half of all Electrical Power-Line Installers and Repairers in the U.S. earn more than $95,320 a year — the middle 80% land between $51,470 and $128,690. About 131,070 people in the U.S. do this work. Figures are for the U.S. occupation group “Electrical Power-Line Installers and Repairers”. (U.S. Bureau of Labor Statistics survey, published 2025.) In India, Craft and related trades workers earn about ₹16,825 a month on average — around ₹2.0 lakh a year (government PLFS survey via ILOSTAT, occupation-family figure).
$95,320typical pay / year
131,070people in this work
$128,690+top 10% earn
₹2.0 lakha year in India (family avg)
Think you get this job?Six quick questions on how it really works — with a hint and the reason behind every answer.
Test yourself →

The work, task by task

These are the real jobs-to-be-done, not a wish list. Each task shows where we found it, and the prompt underneath is written for that exact task.

Fixing3

Inspect and test electrical power lines

+
Walk the assigned 34 kV span from pole 112 to pole 118 with a partner, visually inspect insulators,…
Walk the assigned 34 kV span from pole 112 to pole 118 with a partner, visually inspect insulators, conductors, and hardware under load, perform resistance and voltage tests at each span, record anomalies with photos, and send a signed defect list to lead line foreman by 1700 today.
The tools that do the workGlobal positioning system GPSMicrosoft ExcelESCOjob descriptionsO*NET

Install or repair cables or wires

+
Replace the burned neutral jumper on pole 205 tonight, pull in the new insulated phase conductor, tension to…
Replace the burned neutral jumper on pole 205 tonight, pull in the new insulated phase conductor, tension to spec, splice per company standard, ground temporary feed, test insulation resistance under dead-line procedure, and log work completion to the crew chief before shift end.
The tools that do the workComputer aided design and drafting CADDjob descriptionsO*NET

Erect poles or transmission towers

+
Set up the crew at tower 7-3 tomorrow at first light, assemble crane and gin pole, erect the replacement…
Set up the crew at tower 7-3 tomorrow at first light, assemble crane and gin pole, erect the replacement transmission tower section D, torque anchor bolts to spec, align the tower to adjacent structures, conduct bolt and guy inspections, and update the project supervisor when the section is plumb and secure.
The tools that do the workGeographic information system GISMicrosoft Exceljob descriptionsO*NET
Analysing1

Use truck-mounted buckets to reach equipment

+
Operate the aerial bucket on unit 42 to reach the failed crossarm at pole 59, hoist the lineman into…
Operate the aerial bucket on unit 42 to reach the failed crossarm at pole 59, hoist the lineman into position, replace the crossarm and insulator, reconnect conductors following hot work restrictions, perform a diellectric test, and file the safety checklist with the operations manager before leaving site.
The tools that do the workBentley MicroStationjob descriptionsO*NET
The daily work16

Adhere to safety practices and procedures, such as checking equipment regularly and erecting barriers around work areas.

+
Run the pre-shift safety checklist for the 7 a.m. crew, inspect fall-arrest harnesses and hot-line tools,…
Run the pre-shift safety checklist for the 7 a.m. crew, inspect fall-arrest harnesses and hot-line tools, mark and rope off the Millbrook feeder outage zone, and log equipment condition before we energise any section.
The tools that do the workMicrosoft ExcelO*NET

Trim trees that could be hazardous to the functioning of cables or wires.

+
Survey the Maple Road span for limbs within two metres of conductors, fell and limb the three identified…
Survey the Maple Road span for limbs within two metres of conductors, fell and limb the three identified hazard trees, chip debris clear of the right-of-way, and notify the homeowner at 4 p.m. when restoration is complete.
The tools that do the workGlobal positioning system GPSO*NET

Coordinate work assignment preparation and completion with other workers.

+
Assign crews for the downtown outage: split tasks between the live-line team and the grounds crew, send the…
Assign crews for the downtown outage: split tasks between the live-line team and the grounds crew, send the work plan and isolation diagram to Sam in switching, and confirm each worker has PPE and training logged before mobilising at 6 a.m.
The tools that do the workMicrosoft OutlookMicrosoft ExcelO*NET

Replace or straighten damaged poles.

+
Replace the leaning pole at County Line and Route 9: excavate around the base, set the new treated pole…
Replace the leaning pole at County Line and Route 9: excavate around the base, set the new treated pole plumb, reattach crossarms and insulators, and schedule the sectionaliser cut-in for the afternoon crew once grounding checks pass.
The tools that do the workComputer aided design and drafting CADDO*NET

Dig holes, using augers, and set poles, using cranes and power equipment.

+
Excavate and set the new pole at Vineyard Substation: bore the hole to specified depth and grade, place and…
Excavate and set the new pole at Vineyard Substation: bore the hole to specified depth and grade, place and backfill the pole, rig the boom crane to lift and position the pole safely, then certify the base and guying before the crew returns the line to tension.
The tools that do the workGeographic information system GISGlobal positioning system GPSO*NET

Install watt-hour meters and connect service drops between power lines and consumers' facilities.

+
Install the new watt-hour meter and service drop at 412 Pine Street: de-energise the lateral, mount and seal…
Install the new watt-hour meter and service drop at 412 Pine Street: de-energise the lateral, mount and seal the meter socket, connect the service conductors to the customer panel, test for proper phasing and record meter serial before restoration.
The tools that do the workMicrosoft OfficeO*NET

Clean, tin, and splice corresponding conductors by twisting ends together or by joining ends with metal clamps and soldering connections.

+
Clean and tin the damaged phase conductor on pole 42, then twist the corresponding conductor ends together or…
Clean and tin the damaged phase conductor on pole 42, then twist the corresponding conductor ends together or secure them with a metal clamp and solder the splice so it passes a pull and continuity test before I re-energise the span today.
The tools that do the workComputer aided design and drafting CADDO*NET

Place insulating or fireproofing materials over conductors and joints.

+
Install the specified insulating sleeves and fireproof mastic over the repaired joint on feeder A at tower 7,…
Install the specified insulating sleeves and fireproof mastic over the repaired joint on feeder A at tower 7, fully covering bare metal and labelling the assembly, then photograph and log the protection before signing the safety checklist.
The tools that do the workGeographic information system GISO*NET

Pull up cable by hand from large reels mounted on trucks.

+
Hand-pull 1,000 feet of 556 ACSS from reel truck 13 along the right-of-way, keeping steady tension, feed it…
Hand-pull 1,000 feet of 556 ACSS from reel truck 13 along the right-of-way, keeping steady tension, feed it over the sheave, and stop if tension exceeds safe limits or a snags forms; report progress hourly to the crew lead.
The tools that do the workGlobal positioning system GPSO*NET

Cut trenches for laying underground cables, using trenchers and cable plows.

+
Cut the trench for the new feeder between manhole 3 and 4 using the trencher and cable plow, maintain…
Cut the trench for the new feeder between manhole 3 and 4 using the trencher and cable plow, maintain required cover depth and rock shield, mark conduits every 50 feet, and have the inspector sign off before backfilling today.
The tools that do the workBentley MicroStationO*NET

Identify defective devices, transformers, switches

+
Walk the circuit and test all transformers and switches on feeder B for load imbalance, oil leaks, and…
Walk the circuit and test all transformers and switches on feeder B for load imbalance, oil leaks, and insulation failure; tag any defective device, remove it from service with the crew foreman, and schedule replacement within two shifts.
The tools that do the workMicrosoft Exceljob descriptions

Climb poles and transmission towers

+
Climb the north transmission tower 12 to inspect insulators and hardware, carry two grounding straps and a…
Climb the north transmission tower 12 to inspect insulators and hardware, carry two grounding straps and a hot stick, stay tied off on every step, photograph any corrosion, and radio the foreman before descending.
The tools that do the workMicrosoft Outlookjob descriptions

Assign tasks

+
Assign Friday morning patrols: put Jake on pole inspections along Route 9, Maya on live-line recon at Tower…
Assign Friday morning patrols: put Jake on pole inspections along Route 9, Maya on live-line recon at Tower 14, Luis as crew lead, note required hot-stick and rubber-glove kits, confirm everyone gets the site safety briefing before 06:30.
The tools that do the workMicrosoft OutlookESCO

Resolve problems

+
Troubleshoot the outage at Sector B: map the reported arcing to Tower 8, dispatch Maya and Jake with…
Troubleshoot the outage at Sector B: map the reported arcing to Tower 8, dispatch Maya and Jake with grounding gear and test sets, hold a quick call to agree lockout steps, and log every action so we can close the ticket by shift end.
The tools that do the workGeographic information system GISESCO

Ensure safety in electrical power operations

+
Confirm all live-work permits and PPE are in place for Monday’s transmission line shutdown, verify each crew…
Confirm all live-work permits and PPE are in place for Monday’s transmission line shutdown, verify each crew member has current rubber-glove certification and rescue plan reviewed, and cancel or reassign any personnel who lack clearance before mobilising.
The tools that do the workMicrosoft ExcelESCOsee the evidence ↗

Global positioning

+
Drive the line patrol, mark global positioning at the damaged crossarm and take load-bearing photos, list the…
Drive the line patrol, mark global positioning at the damaged crossarm and take load-bearing photos, list the nearby pole ID and crew required, then publish the outage repair ticket for the morning crew.
The tools that do the workGeographic information system GISO*NET

Says who?

These are the pages we read to build this. Open any of them and check us.

The logs, files & records this job keeps

Shared with other careers — the same record means something different in each.

Related careers

Same family of work — each with its own tasks and prompts.

The LLOS Work Atlas is the world's largest evidenced task library — a map of human work, with a ready prompt behind every task. 1,774 careers · every task named by the sources that witnessed it — O*NET, ESCO, real job descriptions, Wikipedia — and the deepest tasks by several at once. And it is honest about limits: where AI cannot help, the map says so.

The rest of the map

Same library, five ways in.

Copyright © LLOS.ai · 2026 — original pedagogy, voice, and design — all rights reserved.
Built on public evidence: O*NET®, ESCO, Wikipedia, U.S. Bureau of Labor Statistics, ILOSTAT. All sources & licenses