Wind Resource Analyst

Wind Resource Analyst handles technical operations and this page lists 20 real tasks that reveal practical skills and common troubleshooting steps. The tasks reference tools like Autodesk AutoCAD and typical error signs. Each one shows where we found it, and comes with an AI prompt you can copy and use straight away.

20evidenced tasks
20ready prompts
5tools of the trade
15-1299.02O*NET-SOC code
435,370hold this job (US, BLS 2025)
$116,580median pay/yr (US)
Open Wind Resource Analyst in the interactive atlas →

What it pays

Government survey numbers — not estimates, not ads.

Half of all Computer Occupations, All Other in the U.S. earn more than $116,580 a year — the middle 80% land between $55,940 and $188,470. About 435,370 people in the U.S. do this work. Figures are for the U.S. occupation group “Computer Occupations, All Other”. (U.S. Bureau of Labor Statistics survey, published 2025.) In India, Professionals earn about ₹38,298 a month on average — around ₹4.6 lakh a year (government PLFS survey via ILOSTAT, occupation-family figure).
$116,580typical pay / year
435,370people in this work
$188,470+top 10% earn
₹4.6 lakha year in India (family avg)
Think you get this job?Six quick questions on how it really works — with a hint and the reason behind every answer.
Test yourself →

The work, task by task

These are the real jobs-to-be-done, not a wish list. Each task shows where we found it, and the prompt underneath is written for that exact task.

Keeping the record1

Monitor GIS system performance

+
Run performance diagnostics on the GIS server, check map service response times against the 500 ms target,…
Run performance diagnostics on the GIS server, check map service response times against the 500 ms target, identify any slow layers or failed indexes, produce a one-page finding with recommended index or cache changes, and request a maintenance window with IT if response exceeds threshold.
The tools that do the workAmazon Web Services AWSESCOjob descriptionsO*NET
Coordinate1
N

Coordinate with clients or users on GIS needs

+
Meet with the client contact to capture their mapping needs, list required layers, coordinate systems,…
Meet with the client contact to capture their mapping needs, list required layers, coordinate systems, refresh cadence, and delivery formats, then prepare a scope memo with timelines and estimated costs and email it to the client and internal project lead by end of day Thursday.
The tools that do the workAtlassian JIRAjob descriptionsO*NET
The daily work18

Review existing or incoming data for currency, accuracy, usefulness, quality, or completeness of documentation.

+
Scan the incoming anemometer and met mast logs for date gaps, sensor calibrations, and metadata errors, flag…
Scan the incoming anemometer and met mast logs for date gaps, sensor calibrations, and metadata errors, flag records older than two years or missing site coordinates, and produce a one‑page memo listing deficiencies and recommended fixes by Friday.
The tools that do the workAmazon Web Services AWSO*NET

Select cartographic elements needed for effective presentation of information.

+
Choose map elements for the project summary map: wind speed contours, turbine locations, lease boundaries,…
Choose map elements for the project summary map: wind speed contours, turbine locations, lease boundaries, scale bar, north arrow, inset regional map, and a legends panel that explains color ramps and measurement dates for the client poster due Tuesday.
The tools that do the workAutodesk AutoCADO*NET

Interpret aerial or ortho photographs.

+
Examine the aerial and ortho photos for the Hornsby site to identify terrain shadows, water bodies,…
Examine the aerial and ortho photos for the Hornsby site to identify terrain shadows, water bodies, vegetation classes, and any manmade obstructions within two rotor diameters of proposed turbines, and annotate suspicious features for a field survey.
The tools that do the workBentley MicroStationO*NET

Recommend procedures, equipment, or software upgrades to increase data accessibility or ease of use.

+
Draft a short proposal recommending data access improvements: standardized metadata template, central…
Draft a short proposal recommending data access improvements: standardized metadata template, central time‑series archive, and field tablet syncing, include estimated costs, priority, and a three‑month rollout so procurement can budget next quarter.
The tools that do the workAmazon Web Services AWSO*NET

Collaborate with stakeholders to meet objectives

+
Set up a stakeholder workshop with landowner rep Claire, construction PM Javier, and finance lead Sunita to…
Set up a stakeholder workshop with landowner rep Claire, construction PM Javier, and finance lead Sunita to align on micrositing tolerances, data needs, and delivery dates, and circulate a one‑page agenda and decision log beforehand.
The tools that do the workAtlassian JIRAjob descriptions

Contribute to process improvements and solutions

+
Propose three process changes to reduce data handoff errors: standard CSV export template, automated QA…
Propose three process changes to reduce data handoff errors: standard CSV export template, automated QA checks at ingest, and a quarterly cross‑team review; estimate time savings and list who must sign off to pilot each change.
The tools that do the workAtlassian JIRAjob descriptions

Ensure compliance with industry standards

+
Check the site measurement reports and modelling inputs against IEC 61400-12 and the project's quality…
Check the site measurement reports and modelling inputs against IEC 61400-12 and the project's quality checklist, list any non-conformances with paragraph references, and prepare a corrective action plan for review by Tom in compliance by next Wednesday.
The tools that do the workAutodesk AutoCADjob descriptions

Support continuous learning and development

+
Compile the last six months of campaign notes, training certificates, and peer feedback into a single…
Compile the last six months of campaign notes, training certificates, and peer feedback into a single learning record, highlight three skill gaps in wake turbulence modelling, and propose two external courses for Amy to approve by the end of this month.
The tools that do the workAtlassian JIRAjob descriptions

Convert technical information into digital representations

+
Translate the tower met mast instrument logs and LIDAR summaries into georeferenced raster and vector layers…
Translate the tower met mast instrument logs and LIDAR summaries into georeferenced raster and vector layers showing mean wind speed, shear and turbulence intensity, then produce a one-page map and data CSV for the engineering team by Friday.
The tools that do the workBentley MicroStationESCO

Use specialised computer systems, engineering measures, and geological concepts

+
Run the site stability checks using the geological borehole logs, terrain roughness parameters and measured…
Run the site stability checks using the geological borehole logs, terrain roughness parameters and measured wind profiles, document the engineering assumptions and safety margins, and send the report to Marta and the geotech lead by Monday morning.
The tools that do the workAutodesk AutoCADESCO

Use geographic information systems

+
Produce a set of GIS layers showing turbine locations, access tracks, exclusion zones and turbine performance…
Produce a set of GIS layers showing turbine locations, access tracks, exclusion zones and turbine performance sampling points from the survey GPS files, validate spatial accuracy to under two metres, and publish the dataset for the siting team today.
The tools that do the workBentley MicroStationESCOsee the evidence ↗

Collect mapping data

+
Plan and execute the field mapping run: list required GPS waypoints, anemometer calibration checks, and…
Plan and execute the field mapping run: list required GPS waypoints, anemometer calibration checks, and safety brief for the crew, collect the mapping files, and upload validated track logs and metadata to the project folder within 24 hours.
The tools that do the workAutodesk AutoCADESCOsee the evidence ↗

Perform surveying calculations

+
Calculate the survey control adjustments for the Cerro Verde site: ingest the raw GPS and total station…
Calculate the survey control adjustments for the Cerro Verde site: ingest the raw GPS and total station points, apply the published geoid and projection parameters, compute least-squares station adjustments, flag residuals over 25 millimeters, and export a verified control report by Tuesday.
The tools that do the workAutodesk AutoCADESCOsee the evidence ↗

Create thematic maps

+
Produce thematic wind maps for the ridgeline parcel: combine the site wind rose, mean annual wind speed grid,…
Produce thematic wind maps for the ridgeline parcel: combine the site wind rose, mean annual wind speed grid, and landcover classes, style layers for clear legend hierarchy, generate high-resolution map tiles and a printable layout for the planning team by Friday.
The tools that do the workAutodesk AutoCADESCOsee the evidence ↗

Execute analytical mathematical calculations

+
Run the analytical wind-statistics suite on the one-year dataset: compute Weibull parameters per mast, derive…
Run the analytical wind-statistics suite on the one-year dataset: compute Weibull parameters per mast, derive hourly and monthly means, perform uncertainty propagation for turbine energy estimates, and produce a summary table with confidence intervals for procurement by next Wednesday.
The tools that do the workC#ESCOsee the evidence ↗

Apply digital mapping

+
Georeference and mosaic the flight lidar and orthophoto strips for the proposed farm: align tiles to the site…
Georeference and mosaic the flight lidar and orthophoto strips for the proposed farm: align tiles to the site projection, create a seamless digital surface model, clip to the lease boundary, and output tiled base layers for the modelling team tomorrow morning.
The tools that do the workAutodesk AutoCADESCOsee the evidence ↗

Process collected survey data

+
Clean and QA the field survey logs from masts A, B and C: filter GNSS fixes, remove outages, interpolate…
Clean and QA the field survey logs from masts A, B and C: filter GNSS fixes, remove outages, interpolate missing heights where justified, compute corrected turbine hub-height profiles and deliver a validated CSV for resource modelling today.
The tools that do the workC#ESCOsee the evidence ↗

Geological mapping

+
Produce the geological base map for permit submission: digitise mapped units from the field drone imagery,…
Produce the geological base map for permit submission: digitise mapped units from the field drone imagery, symbolise lithologies and faults, add stratigraphic labels and scale bar, then export a print-ready map and the GIS layer package for the geotech by Friday afternoon.
The tools that do the workAutodesk AutoCADESCOsee the evidence ↗

Says who?

These are the pages we read to build this. Open any of them and check us.

The logs, files & records this job keeps

Shared with other careers — the same record means something different in each.

Related careers

Same family of work — each with its own tasks and prompts.

The LLOS Work Atlas is the world's largest evidenced task library — a map of human work, with a ready prompt behind every task. 1,774 careers · every task named by the sources that witnessed it — O*NET, ESCO, real job descriptions, Wikipedia — and the deepest tasks by several at once. And it is honest about limits: where AI cannot help, the map says so.

The rest of the map

Same library, five ways in.

Copyright © LLOS.ai · 2026 — original pedagogy, voice, and design — all rights reserved.
Built on public evidence: O*NET®, ESCO, Wikipedia, U.S. Bureau of Labor Statistics, ILOSTAT. All sources & licenses