Project Architect

Project Architect manages the concrete responsibilities described here, with 20 real tasks included for reference. Learn which priorities guide decisions across a typical workday. Each one shows where we found it, and comes with an AI prompt you can copy and use straight away.

20evidenced tasks
20ready prompts
8tools of the trade
17-1011.00O*NET-SOC code
106,770hold this job (US, BLS 2025)
$99,280median pay/yr (US)
Open Project Architect in the interactive atlas →

What it pays

Government survey numbers — not estimates, not ads.

Half of all Architects, Except Landscape and Naval in the U.S. earn more than $99,280 a year — the middle 80% land between $62,300 and $161,420. About 106,770 people in the U.S. do this work. Figures are for the U.S. occupation group “Architects, Except Landscape and Naval”. (U.S. Bureau of Labor Statistics survey, published 2025.) In India, Professionals earn about ₹38,298 a month on average — around ₹4.6 lakh a year (government PLFS survey via ILOSTAT, occupation-family figure).
$99,280typical pay / year
106,770people in this work
$161,420+top 10% earn
₹4.6 lakha year in India (family avg)
Think you get this job?Six quick questions on how it really works — with a hint and the reason behind every answer.
Test yourself →

The work, task by task

These are the real jobs-to-be-done, not a wish list. Each task shows where we found it, and the prompt underneath is written for that exact task.

Keeping the record1

Develop construction plans

+
Develop full construction drawings for the mixed-use dockside tower, coordinate structural and MEP layouts…
Develop full construction drawings for the mixed-use dockside tower, coordinate structural and MEP layouts with the engineer, dimension to permit level, include materials schedule and a cost-checked glazing panel detail for Friday review with Priya in procurement.
The tools that do the workAdobe InDesignAdobe Acrobatjob descriptionsO*NET
The daily work19

Ensure vessel compliance with regulations

+
Review the stability booklet, structural drawings, and machinery logs, then produce a compliance memorandum…
Review the stability booklet, structural drawings, and machinery logs, then produce a compliance memorandum certifying the hull, stability, and propulsion meet SOLAS and flag state rules, list any non-conformances, and recommend remedial actions by Friday.
The tools that do the workAdobe AcrobatESCOsee the evidence ↗

Analyse floating structures

+
Analyse the floating structures concept for the harbour expansion: inspect the structural drawings, calculate…
Analyse the floating structures concept for the harbour expansion: inspect the structural drawings, calculate hydrostatic stability under 2.5 m wave and 20 tonne live loads, identify failure modes, and deliver a one-page risk summary for the design team by Thursday.
The tools that do the workAmazon Elastic Compute Cloud EC2ESCO

Assess financial viability

+
Assess the financial viability of the mooring barge option: build a three-year cashflow with capital…
Assess the financial viability of the mooring barge option: build a three-year cashflow with capital expenditure, OPEX, salvage value and 8% discount, compare to a leased jack-up alternative, and recommend proceed, hold or reject with a short sensitivity table by Friday.
The tools that do the workAmazon RedshiftESCOsee the evidence ↗

Engineering principles

+
Apply core engineering principles to the floating quay: verify load paths from deck to buoyancy chambers,…
Apply core engineering principles to the floating quay: verify load paths from deck to buoyancy chambers, check material stress limits at connection details for fatigue under cyclic wave loading, and list three required design changes to meet a 25‑year life.
The tools that do the workAmazon Elastic Compute Cloud EC2ESCOsee the evidence ↗

Mechanical engineering

+
Resolve the mechanical systems for the floating platform: size bilge and ballast pumps for a 10 000 m3…
Resolve the mechanical systems for the floating platform: size bilge and ballast pumps for a 10 000 m3 displacement, specify power and redundancy for maintenance access, and produce a marked-up mechanical layout for the MEP contractor by next Wednesday.
The tools that do the workAmazon Elastic Compute Cloud EC2ESCOsee the evidence ↗

Use maritime English

+
Rewrite the project technical summary in maritime English for the port authority: replace land-based terms…
Rewrite the project technical summary in maritime English for the port authority: replace land-based terms with conventional shipboard phrasing, include bearings, heading, draft and freeboard values, and supply a one-page cover letter suitable for the harbour master.
The tools that do the workAdobe AcrobatESCOsee the evidence ↗

Execute feasibility study

+
Execute a feasibility study for the floating logistics hub: scope the technical concept, estimate CAPEX and…
Execute a feasibility study for the floating logistics hub: scope the technical concept, estimate CAPEX and OPEX ranges, run a two-scenario risk register, and conclude with go/no-go criteria and three mitigation actions for stakeholders within ten working days.
The tools that do the workAmazon Elastic Compute Cloud EC2ESCOsee the evidence ↗

Gather information related to projects' environmental sustainability or operational efficiency.

+
Collect existing sustainability and operational-efficiency data for the Portside Housing project: current…
Collect existing sustainability and operational-efficiency data for the Portside Housing project: current utility bills, HVAC performance logs, equipment make/models, recent energy audits, and maintenance records; highlight gaps and urgent data I must verify on site by Monday.
The tools that do the workAmazon Web Services AWSO*NET

Calculate potential energy savings by comparing estimated energy consumption of proposed design to baseline standards.

+
Model estimated annual energy use for Tower A and compare it to the local code baseline, show lighting, HVAC,…
Model estimated annual energy use for Tower A and compare it to the local code baseline, show lighting, HVAC, and plug loads side-by-side, calculate percentage savings and simple payback using current energy tariffs, and flag assumptions that change the result by more than 10%.
The tools that do the workAmazon RedshiftO*NET

Prepare operating and maintenance manuals, studies, or reports.

+
Draft the operations and maintenance manual for Riverside Ferry Terminal: equipment lists with service…
Draft the operations and maintenance manual for Riverside Ferry Terminal: equipment lists with service intervals, spare parts, lubricants and tolerances, emergency shut-down procedures, and an annual testing schedule tied to vendors and regulatory certificates.
The tools that do the workAdobe AcrobatO*NET

Plan structures

+
Produce a preliminary structural plan for the new drydock shed: foundation type and capacity, column grid,…
Produce a preliminary structural plan for the new drydock shed: foundation type and capacity, column grid, primary beam sizes, wind and load assumptions, and a short note on constructability and cost drivers for the contractor's tender pack.
The tools that do the workApache Mavenjob descriptions

Use CADD software

+
Export and check the latest CADD drawing set for Marina Office block: layer names, units, annotation styles,…
Export and check the latest CADD drawing set for Marina Office block: layer names, units, annotation styles, door and window schedules, and a sheet index that updates when I add the mechanical coordination drawings; flag missing references before I issue for coordination.
The tools that do the workAmazon Elastic Compute Cloud EC2job descriptions

Build all types of boats from pleasure crafts to naval vessels

+
Develop the concept and feasibility brief for a 24‑metre patrol boat: hull form options, displacement…
Develop the concept and feasibility brief for a 24‑metre patrol boat: hull form options, displacement estimates, propulsion and fuel consumption, build scope for steel vs aluminium, regulatory class implications, and a budget range with schedule risks for the client review next Thursday.
The tools that do the workApache HadoopESCO

Meet with clients to review or discuss architectural drawings.

+
Review the latest construction drawings with Mr. Patel and Sara from procurement, walk through key…
Review the latest construction drawings with Mr. Patel and Sara from procurement, walk through key dimensions, structural assumptions and cost implications, note clients' requested changes, and produce a signed meeting record by Friday afternoon.
The tools that do the workAdobe AcrobatO*NET

Inspect proposed building sites to determine suitability for construction.

+
Visit the 47th Street lot with the surveyor and site engineer, inspect ground conditions, access, drainage…
Visit the 47th Street lot with the surveyor and site engineer, inspect ground conditions, access, drainage and utilities, confirm any constraints for foundations, take photos, and email a site suitability memo to the developer by close of business Tuesday.
The tools that do the workAdobe AcrobatO*NET

Administer construction contracts.

+
Prepare the contract administration package for the Riverside build, review the contractor's progress claims…
Prepare the contract administration package for the Riverside build, review the contractor's progress claims against the working drawings, issue a compliance notice where payments exceed agreed milestones, and circulate the revised payment schedule to procurement and finance within three days.
The tools that do the workAdobe AcrobatO*NET

Develop marketing materials, proposals, or presentations to generate new work opportunities.

+
Create a concise proposal and slide deck for Blue Harbor that shows concept images, scope, budget ranges and…
Create a concise proposal and slide deck for Blue Harbor that shows concept images, scope, budget ranges and key milestones, tailor two short case studies of similar projects, and send the draft to business development and the principal for review by Wednesday noon.
The tools that do the workAdobe InDesignAdobe PhotoshopO*NET

Perform predesign services, such as feasibility or environmental impact studies.

+
Carry out a feasibility study for the Old Mill site: evaluate zoning and environmental constraints, estimate…
Carry out a feasibility study for the Old Mill site: evaluate zoning and environmental constraints, estimate build cost and energy performance, recommend whether to proceed and provide an executive summary to the planning team by Friday.
The tools that do the workAdobe AcrobatO*NET

Design or plan construction of green building projects to minimize adverse environmental impact or conserve energy.

+
Develop the schematic design for the community center with passive strategies and energy targets, list…
Develop the schematic design for the community center with passive strategies and energy targets, list materials and systems that reduce carbon, run a simple lifecycle cost estimate, and deliver a one-page sustainability brief to the client and the engineer next Monday.
The tools that do the workAdobe InDesignO*NET

Says who?

These are the pages we read to build this. Open any of them and check us.

Activities this job lives in

The human activities behind the tasks — each with its honest AI ceiling.

The logs, files & records this job keeps

Shared with other careers — the same record means something different in each.

Related careers

Same family of work — each with its own tasks and prompts.

The LLOS Work Atlas is the world's largest evidenced task library — a map of human work, with a ready prompt behind every task. 1,774 careers · every task named by the sources that witnessed it — O*NET, ESCO, real job descriptions, Wikipedia — and the deepest tasks by several at once. And it is honest about limits: where AI cannot help, the map says so.

The rest of the map

Same library, five ways in.

Copyright © LLOS.ai · 2026 — original pedagogy, voice, and design — all rights reserved.
Built on public evidence: O*NET®, ESCO, Wikipedia, U.S. Bureau of Labor Statistics, ILOSTAT. All sources & licenses