Scada Engineer Energy

Scada Engineer Energy assesses people, records findings, and performs 23 concrete steps used in routine work. The tasks focus on communication with clients and colleagues and what matters most each shift. Each one shows where we found it, and comes with an AI prompt you can copy and use straight away.

23evidenced tasks
23ready prompts
7tools of the trade
17-2051.00O*NET-SOC code
367,840hold this job (US, BLS 2025)
$100,840median pay/yr (US)
Open Scada Engineer Energy in the interactive atlas →

What it pays

Government survey numbers — not estimates, not ads.

Half of all Civil Engineers in the U.S. earn more than $100,840 a year — the middle 80% land between $68,240 and $163,220. About 367,840 people in the U.S. do this work. Figures are for the U.S. occupation group “Civil Engineers”. (U.S. Bureau of Labor Statistics survey, published 2025.) In India, Professionals earn about ₹38,298 a month on average — around ₹4.6 lakh a year (government PLFS survey via ILOSTAT, occupation-family figure).
$100,840typical pay / year
367,840people in this work
$163,220+top 10% earn
₹4.6 lakha year in India (family avg)
Think you get this job?Six quick questions on how it really works — with a hint and the reason behind every answer.
Test yourself →

The work, task by task

These are the real jobs-to-be-done, not a wish list. Each task shows where we found it, and the prompt underneath is written for that exact task.

Analysing4

Supervise site investigations

+
Supervise the on-site investigations at GridX substation in Barnet next Tuesday, confirm access and safety…
Supervise the on-site investigations at GridX substation in Barnet next Tuesday, confirm access and safety brief with site foreman Mark Davies, record CCTV points and SCADA I/O tag readings, then upload the annotated field sketch and signed attendance sheet.
The tools that do the workAutodesk AutoCAD Civil 3DMicrosoft Exceljob descriptionsO*NETWikipedia

Ensure safety standards

+
Ensure all site works on the Harlow RTU installation follow the safety pack: verify the RAMS are signed by…
Ensure all site works on the Harlow RTU installation follow the safety pack: verify the RAMS are signed by contractor lead Tom Ellis, confirm isolation procedures for LV panels, and photographproof that PPE and exclusion zones are in place before any live testing begins.
The tools that do the workAdobe Acrobatjob descriptionsWikipedia

Evaluate and select appropriate construction materials

+
Evaluate and select suitable conduit, cable glands and earthing materials for the new telemetry cabinets at…
Evaluate and select suitable conduit, cable glands and earthing materials for the new telemetry cabinets at Eastwick, compare vendor datasheets, check IP ratings against site exposure, and pick the preferred items with justification for procurement by Thursday.
The tools that do the workAutodesk AutoCADMicrosoft ExcelO*NETWikipedia

Assess project risks

+
Assess project risks for the Midlands SCADA rollout, run through timing conflicts, spare-parts availability,…
Assess project risks for the Midlands SCADA rollout, run through timing conflicts, spare-parts availability, cyber access concerns and contractor competence, score each risk, and produce a mitigation plan to present at Monday morning project board.
The tools that do the workMicrosoft ExcelMicrosoft Officejob descriptionsWikipedia
Keeping the record1

Prepare project bids

+
Prepare the bid for the North Thames telemetry upgrade due Friday, compile baseline scope, equipment…
Prepare the bid for the North Thames telemetry upgrade due Friday, compile baseline scope, equipment estimates, labour days and contingency, attach previous change orders from the Riverdale job, and produce a priced submission for commercial review by Wednesday noon.
The tools that do the workMicrosoft ExcelMicrosoft Officejob descriptionsWikipedia
Convincing1

Liaise with clients

+
Liaise with NationalGrid contact Priya Shah about the proposed SCADA I/O mapping changes, share the updated…
Liaise with NationalGrid contact Priya Shah about the proposed SCADA I/O mapping changes, share the updated wiring schedule, confirm their preferred cutover weekend and note any operational constraints before Friday so the design can be locked.
The tools that do the workMicrosoft Officejob descriptionsWikipedia
The daily work17

Conduct feasibility studies

+
Run a feasibility study for the 33 kV substation at Ridgeway: survey existing SCADA telemetry points,…
Run a feasibility study for the 33 kV substation at Ridgeway: survey existing SCADA telemetry points, estimate fiber and RTU link costs, model outage scenarios, and produce a recommendation memo with cost, schedule, and risk by Friday.
The tools that do the workMicrosoft ExcelESRI ArcGISjob descriptionsO*NET

Design infrastructure blueprints

+
Produce infrastructure blueprints for the new control house at Northgate: dimension the I/O rack layouts,…
Produce infrastructure blueprints for the new control house at Northgate: dimension the I/O rack layouts, show cable routes and gland locations, mark HVAC and earthing connections, and export a print-ready set for stakeholder review next Tuesday.
The tools that do the workAutodesk AutoCADjob descriptionsWikipedia

Develop or implement engineering solutions to clean up industrial accidents or other contaminated sites.

+
Draft an engineering response to the chemical spill at Pump Station 4: document temporary SCADA isolation…
Draft an engineering response to the chemical spill at Pump Station 4: document temporary SCADA isolation steps, specify leak detection sensors and purge valves, estimate materials and labor to decontaminate cabinets, and submit a safety-checked action plan by 48 hours.
The tools that do the workMicrosoft OfficeAdobe AcrobatO*NET

Compute load and grade requirements, water flow rates, or material stress factors to determine design specifications.

+
Calculate load and grade specs for the pipeline crossings on Line 7: compute conductor ampacity, hydraulic…
Calculate load and grade specs for the pipeline crossings on Line 7: compute conductor ampacity, hydraulic head for the booster pumps, and material stress factors for elevated supports, then produce a design spec sheet with safety margins by Thursday.
The tools that do the workMicrosoft ExcelO*NET

Plan and design transportation or hydraulic systems or structures, using computer-assisted design or drawing tools.

+
Design the hydraulic routing for the new cooling-water system serving Substation B: produce system schematics…
Design the hydraulic routing for the new cooling-water system serving Substation B: produce system schematics showing pump sizes, pipe diameters, head loss calculations, and control valve locations, then hand over a construction-ready drawing set next week.
The tools that do the workAutodesk AutoCAD Civil 3DO*NET

Analyze survey reports, maps, drawings, blueprints, aerial photography, or other topographical or geologic data.

+
Analyse the survey and aerial data for the proposed relay site at Timber Loop: reconcile topographic contours…
Analyse the survey and aerial data for the proposed relay site at Timber Loop: reconcile topographic contours with as-built schematics, identify floodplain and cable corridor constraints, and produce a site assessment report with recommended fixes by Monday.
The tools that do the workESRI ArcGISAutodesk AutoCADO*NET
SOIL

Test soils or materials to determine the adequacy and strength of foundations, concrete, asphalt, or steel.

+
Arrange and witness compressive and shear testing on the site soils and concrete samples, verify test…
Arrange and witness compressive and shear testing on the site soils and concrete samples, verify test standards and sample IDs match the pile design numbers, log results, flag any strength shortfalls to the geotechnical lead by Wednesday and recommend hold or remedial pour plans.
The tools that do the workMicrosoft ExcelO*NET

Design or engineer systems to efficiently dispose of chemical, biological, or other toxic wastes.

+
Develop a safe disposal scheme for the plant's chemical wastes, map the containment and treatment stages,…
Develop a safe disposal scheme for the plant's chemical wastes, map the containment and treatment stages, calculate required neutralisation volumes and transport frequency, circulate the scheme to environmental compliance and operations for approval by next Monday.
The tools that do the workAutodesk AutoCAD Civil 3DO*NET

Analyze survey data

+
Clean, validate and analyse the recent field survey points against the SCADA site grid, produce summary…
Clean, validate and analyse the recent field survey points against the SCADA site grid, produce summary tables of offsets, identify any systematic survey bias, and deliver a corrected point set plus a two-page anomaly note to the surveyor by close of business tomorrow.
The tools that do the workMicrosoft ExcelESRI ArcGISjob descriptions

Prepare technical reports

+
Compile the site test logs, instrumentation readings and fault logs into a concise technical report that…
Compile the site test logs, instrumentation readings and fault logs into a concise technical report that states acceptance against spec clauses, includes three key failure modes with mitigation, and submit the draft to the project engineer for review on Friday.
The tools that do the workMicrosoft OfficeAdobe Acrobatjob descriptions

Oversee structure implementation

+
Supervise the erection of the control room steel frame and cable trays this week, verify anchor bolts and…
Supervise the erection of the control room steel frame and cable trays this week, verify anchor bolts and concrete curing meet design tolerances, sign off daily nonconformance reports, and instruct the contractor to stop work if deflections exceed limits.
The tools that do the workAutodesk AutoCADjob descriptions

Review design drawings

+
Review the electrical and civil design drawings for the new RTU skids, check cable schedules, earthing…
Review the electrical and civil design drawings for the new RTU skids, check cable schedules, earthing details and clearances against equipment specs, annotate any discrepancies, and return a consolidated list to the design team by Tuesday morning.
The tools that do the workBentley MicroStationjob descriptions

Monitor project progress

+
Review the weekly project tracker, compare actual milestones against the baseline schedule for the substation…
Review the weekly project tracker, compare actual milestones against the baseline schedule for the substation relays and RTU installs, flag any two-week slippages, note responsible contractors, and email a concise status to Tom in Projects by Friday noon.
The tools that do the workMicrosoft Exceljob descriptions

Analyze environmental impact

+
Map recent wetland buffers and protected zones against the planned SCADA cable routes, calculate affected…
Map recent wetland buffers and protected zones against the planned SCADA cable routes, calculate affected area and potential tree removal totals, summarise findings with recommendations for mitigation and send to Emma in Environmental by Wednesday close of business.
The tools that do the workESRI ArcGISjob descriptions

Develop repair plans

+
Draft repair plans for the failed telemetry cabinet: list required parts, step-by-step isolation and…
Draft repair plans for the failed telemetry cabinet: list required parts, step-by-step isolation and replacement procedures, estimated outage window, and labour hours, then circulate to Maintenance lead Javier and the site foreman before the Monday shift handover.
The tools that do the workMicrosoft Officejob descriptions

Operate infrastructure systems effectively

+
Compile operational checks for the regional SCADA stack: include communication health, PLC I/O diagnostics,…
Compile operational checks for the regional SCADA stack: include communication health, PLC I/O diagnostics, fallback procedures and KPIs to monitor, then send the one-page ops checklist to Operations manager Lei and the on-call engineer for immediate adoption.
The tools that do the workMicrosoft ExcelWikipedia

Protect public and environmental health during projects

+
Prepare a site protection brief for the upcoming fiber pull: identify public access controls, spill response…
Prepare a site protection brief for the upcoming fiber pull: identify public access controls, spill response steps, noise and dust limits, emergency contacts and permit obligations, then distribute to Construction manager Rachel and the health and safety officer by Thursday morning.
The tools that do the workMicrosoft OfficeWikipedia

Says who?

These are the pages we read to build this. Open any of them and check us.

Related careers

Same family of work — each with its own tasks and prompts.

The LLOS Work Atlas is the world's largest evidenced task library — a map of human work, with a ready prompt behind every task. 1,774 careers · every task named by the sources that witnessed it — O*NET, ESCO, real job descriptions, Wikipedia — and the deepest tasks by several at once. And it is honest about limits: where AI cannot help, the map says so.

The rest of the map

Same library, five ways in.

Copyright © LLOS.ai · 2026 — original pedagogy, voice, and design — all rights reserved.
Built on public evidence: O*NET®, ESCO, Wikipedia, U.S. Bureau of Labor Statistics, ILOSTAT. All sources & licenses