Site Architect

Site Architect does the practical work shown here and the page includes 20 real tasks to try. Discover what surprises new people and how experienced staff handle it. Each one shows where we found it, and comes with an AI prompt you can copy and use straight away.

20evidenced tasks
20ready prompts
8tools of the trade
17-1011.00O*NET-SOC code
106,770hold this job (US, BLS 2025)
$99,280median pay/yr (US)
Open Site Architect in the interactive atlas →

What it pays

Government survey numbers — not estimates, not ads.

Half of all Architects, Except Landscape and Naval in the U.S. earn more than $99,280 a year — the middle 80% land between $62,300 and $161,420. About 106,770 people in the U.S. do this work. Figures are for the U.S. occupation group “Architects, Except Landscape and Naval”. (U.S. Bureau of Labor Statistics survey, published 2025.) In India, Professionals earn about ₹38,298 a month on average — around ₹4.6 lakh a year (government PLFS survey via ILOSTAT, occupation-family figure).
$99,280typical pay / year
106,770people in this work
$161,420+top 10% earn
₹4.6 lakha year in India (family avg)
Think you get this job?Six quick questions on how it really works — with a hint and the reason behind every answer.
Test yourself →

The work, task by task

These are the real jobs-to-be-done, not a wish list. Each task shows where we found it, and the prompt underneath is written for that exact task.

Keeping the record1

Develop construction plans

+
Prepare site-specific construction plans showing access routes, temporary works, and tidal load…
Prepare site-specific construction plans showing access routes, temporary works, and tidal load considerations for the berth, coordinate with the civils team, and produce a permit-ready set to hand to the harbour master by next Wednesday.
The tools that do the workAdobe InDesignAdobe Acrobatjob descriptionsO*NET
The daily work19

Ensure vessel compliance with regulations

+
Review the vessel plans, stability book, and recent survey, confirm compliance with SOLAS and local flag…
Review the vessel plans, stability book, and recent survey, confirm compliance with SOLAS and local flag rules, list every non-compliant item with required corrective work, estimated cost, and a recommended completion date for the owner's approval.
The tools that do the workAdobe AcrobatESCOsee the evidence ↗

Meet with clients to review or discuss architectural drawings.

+
Walk Priya and James through the latest floor and elevation drawings, explain the changes to structural spans…
Walk Priya and James through the latest floor and elevation drawings, explain the changes to structural spans and MEP routes, note their sign-offs or objections, and produce a marked-up set for the contractor before Friday afternoon.
The tools that do the workAdobe AcrobatO*NET

Inspect proposed building sites to determine suitability for construction.

+
Visit the Shoreline Lane parcel at 10:00, inspect ground conditions, note access, drainage and bearing…
Visit the Shoreline Lane parcel at 10:00, inspect ground conditions, note access, drainage and bearing strata, photograph anomalies, advise if piled foundations or flood mitigation are required and send a short viability memo by Monday.
The tools that do the workAdobe AcrobatO*NET

Administer construction contracts.

+
Prepare and issue the payment application review: check contractor claims against the schedule of values,…
Prepare and issue the payment application review: check contractor claims against the schedule of values, confirm work in place, record retained amounts, escalate disputed items to procurement and request certified invoices for release by Thursday.
The tools that do the workAdobe AcrobatO*NET

Develop marketing materials, proposals, or presentations to generate new work opportunities.

+
Draft a two-page project brief and three-slide pitch showing concept massing, sustainability highlights, and…
Draft a two-page project brief and three-slide pitch showing concept massing, sustainability highlights, and fee estimate, tailor the language to the municipal planner and developer, and email the PDF by Wednesday morning.
The tools that do the workAdobe InDesignAdobe PhotoshopO*NET

Perform predesign services, such as feasibility or environmental impact studies.

+
Carry out a predesign feasibility: assemble site constraints, run a simple energy and daylighting test, list…
Carry out a predesign feasibility: assemble site constraints, run a simple energy and daylighting test, list environmental risks and cost drivers, and deliver a recommended concept with budget range to the client within ten days.
The tools that do the workAdobe AcrobatO*NET

Design or plan construction of green building projects to minimize adverse environmental impact or conserve energy.

+
Develop a green design concept: produce site plan and sections showing passive strategies, list material and…
Develop a green design concept: produce site plan and sections showing passive strategies, list material and HVAC choices to hit a 30 percent energy reduction target, and prepare a client-ready summary and estimated cost delta by next Friday.
The tools that do the workAdobe IllustratorAdobe InDesignO*NET

Analyse floating structures

+
Analyze the proposed floating breakwater at Pier 7 for stability, list dominant load cases, estimate required…
Analyze the proposed floating breakwater at Pier 7 for stability, list dominant load cases, estimate required buoyancy and mooring stiffness, and flag three deal-breaker structural risks before Friday so I can brief the port engineer.
The tools that do the workAmazon Elastic Compute Cloud EC2ESCO

Assess financial viability

+
Assess the financial viability of leasing a 120-metre modular barge farm for five years: produce a 10-year…
Assess the financial viability of leasing a 120-metre modular barge farm for five years: produce a 10-year cashflow, capex and opex breakdown, NPV at 8 percent, and a sensitivity to storm-damage downtime for the investment committee next Tuesday.
The tools that do the workAmazon RedshiftESCOsee the evidence ↗

Engineering principles

+
Apply engineering principles to detail the load path from deck equipment to pontoons for the southern mooring…
Apply engineering principles to detail the load path from deck equipment to pontoons for the southern mooring field, produce a sketch of primary load paths and justify material choices under cyclic wave loading by Wednesday.
The tools that do the workAmazon Elastic Compute Cloud EC2ESCOsee the evidence ↗

Mechanical engineering

+
Design the mechanical systems for the floating platform plantroom: specify pump sizing, shafting tolerance,…
Design the mechanical systems for the floating platform plantroom: specify pump sizing, shafting tolerance, power take-off arrangement and maintenance access, and produce a failure-mode list for the chief mechanical engineer by Friday.
The tools that do the workAmazon Elastic Compute Cloud EC2ESCOsee the evidence ↗

Use maritime English

+
Rewrite the site handover notes into maritime English: convert lay descriptions into bridge-crew language,…
Rewrite the site handover notes into maritime English: convert lay descriptions into bridge-crew language, annotate positions with bearings and distances, and prepare a one-page briefing for the harbour master by Wednesday morning.
The tools that do the workAdobe AcrobatESCOsee the evidence ↗

Execute feasibility study

+
Execute a feasibility study for the tidal-energy mooring array: compile site bathymetry, seabed soil report,…
Execute a feasibility study for the tidal-energy mooring array: compile site bathymetry, seabed soil report, cost estimate, regulatory hurdles and a go/no-go recommendation with three mitigation options for the board in ten days.
The tools that do the workAmazon Elastic Compute Cloud EC2ESCOsee the evidence ↗

Gather information related to projects' environmental sustainability or operational efficiency.

+
Collect project files, test reports, supplier green certifications, utility bills and recent site energy…
Collect project files, test reports, supplier green certifications, utility bills and recent site energy audits for the East Dock refurbishment and the Ferry Terminal upgrade, flag gaps and prepare a two-page summary for the client and MEP team by Thursday.
The tools that do the workAdobe AcrobatO*NET

Calculate potential energy savings by comparing estimated energy consumption of proposed design to baseline standards.

+
Run a side-by-side annual consumption comparison of the proposed HVAC and lighting schemes against the local…
Run a side-by-side annual consumption comparison of the proposed HVAC and lighting schemes against the local code baseline for Pier 7, show kWh, peak kW and cost savings at current tariff, and produce a one-page statement of expected payback within ten years.
The tools that do the workAmazon RedshiftO*NET

Prepare operating and maintenance manuals, studies, or reports.

+
Draft the operating and maintenance manual for the Harbour Control building including routine MEP checklists,…
Draft the operating and maintenance manual for the Harbour Control building including routine MEP checklists, equipment ratings, spare parts list and maintenance intervals, tie each procedure to the original installation drawing references and deliver a clean printable PDF for handover next Monday.
The tools that do the workAdobe InDesignO*NET

Plan structures

+
Produce preliminary structural layouts for the new quay shelter showing columns, roof spans, foundation types…
Produce preliminary structural layouts for the new quay shelter showing columns, roof spans, foundation types and load notes, include brief feasibility notes on constructability and estimated preliminary costs for discussion in Friday’s coordination meeting.
The tools that do the workAdobe Illustratorjob descriptions

Use CADD software

+
Translate the floor plans and MEP coordination sketches into fully dimensioned CAD drawings with layers for…
Translate the floor plans and MEP coordination sketches into fully dimensioned CAD drawings with layers for structure, services and fittings, ensure drawings scale correctly and export a coordinated set for the contractor by Wednesday morning.
The tools that do the workApache Mavenjob descriptions

Build all types of boats from pleasure crafts to naval vessels

+
Prepare concept and feasibility pack for the new patrol boat series covering hull forms, displacement…
Prepare concept and feasibility pack for the new patrol boat series covering hull forms, displacement estimates, propulsion options, stability notes and a budgetary cost model, emphasise safety margins and lead times for steel hull production for the naval client meeting next Tuesday.
The tools that do the workAmazon Web Services AWSESCO

Says who?

These are the pages we read to build this. Open any of them and check us.

Activities this job lives in

The human activities behind the tasks — each with its honest AI ceiling.

The logs, files & records this job keeps

Shared with other careers — the same record means something different in each.

Related careers

Same family of work — each with its own tasks and prompts.

The LLOS Work Atlas is the world's largest evidenced task library — a map of human work, with a ready prompt behind every task. 1,774 careers · every task named by the sources that witnessed it — O*NET, ESCO, real job descriptions, Wikipedia — and the deepest tasks by several at once. And it is honest about limits: where AI cannot help, the map says so.

The rest of the map

Same library, five ways in.

Copyright © LLOS.ai · 2026 — original pedagogy, voice, and design — all rights reserved.
Built on public evidence: O*NET®, ESCO, Wikipedia, U.S. Bureau of Labor Statistics, ILOSTAT. All sources & licenses