6 tasks, each one witnessed by the sources that watched the job — and behind every one, a prompt you can use tonight.
You usually split time between desk work and meetings. Mornings often mean running capacity models in SIMMOD or CAST, checking GIS maps and AutoCAD drawings, and reviewing passenger forecasts.
Afternoons can be stakeholder meetings with airlines and local authorities, writing parts of a master plan, or doing site visits to measure pavement or terminal flow. Deadlines cluster around planning milestones and grant cycles.
Expect GIS and AutoCAD daily: GIS for site and environmental mapping, AutoCAD for drawing terminal and airside geometry. ArcPORT and AviPlan are common for terminal layouts and passenger processing studies.
Use SIMMOD and CAST for airside capacity and traffic simulation, and spreadsheets for demand forecasts and scenario tables.
Use AI for drafting text, summarising meeting notes, or generating checklist ideas, but never for final technical calculations. Run all forecasts and simulations in verified systems like SIMMOD, CAST, or AviPlan.
Treat AI output as a first draft. Always cross-check numbers against your models and retain versioned source files (AutoCAD, GIS, model inputs) for audits and funding applications.
A bachelor’s in civil engineering, transportation planning, or aviation management is common. Take courses in GIS, CAD (AutoCAD), and transport modelling (SIMMOD basics if offered).
Short courses or certificates in airport planning or pavement design, plus hands-on experience with ArcPORT or AviPlan through internships, make you noticeably more hireable.
Airport planners design long-term layouts, passenger processing flows, and capacity studies using tools like AviPlan and SIMMOD, not the real-time control of aircraft that air traffic controllers do.
Compared with generic civil engineers, planners focus on operational relationships—terminals, runways, traffic forecasts—and use aviation-specific systems (CAST, ArcPORT) and stakeholder planning documents.
Clear technical communication: you must explain model assumptions, forecast numbers, and layout trade-offs to non-technical stakeholders and regulators.
That means producing tidy AutoCAD drawings, annotated GIS maps, and short, accurate summaries of SIMMOD/CAST outputs so decision-makers can act.