Drone Operator

Drone Operator monitors progress and these 22 real tasks show the checks, intervals, and flags you’ll use to know if plans are working. Tasks explain simple indicators and when to change course. Each one shows where we found it, and comes with an AI prompt you can copy and use straight away.

22evidenced tasks
22ready prompts
7tools of the trade
51-8093.00O*NET-SOC code
33,160hold this job (US, BLS 2025)
$96,710median pay/yr (US)
Open Drone Operator in the interactive atlas →

What it pays

Government survey numbers — not estimates, not ads.

Half of all Petroleum Pump System Operators, Refinery Operators, and Gaugers in the U.S. earn more than $96,710 a year — the middle 80% land between $57,110 and $115,880. About 33,160 people in the U.S. do this work. Figures are for the U.S. occupation group “Petroleum Pump System Operators, Refinery Operators, and Gaugers”. (U.S. Bureau of Labor Statistics survey, published 2025.) In India, Plant and machine operators and assemblers earn about ₹17,329 a month on average — around ₹2.1 lakh a year (government PLFS survey via ILOSTAT, occupation-family figure).
$96,710typical pay / year
33,160people in this work
$115,880+top 10% earn
₹2.1 lakha year in India (family avg)
Think you get this job?Six quick questions on how it really works — with a hint and the reason behind every answer.
Test yourself →

The work, task by task

These are the real jobs-to-be-done, not a wish list. Each task shows where we found it, and the prompt underneath is written for that exact task.

Fixing2

Maintain and repair equipment

+
Inspect the quadcopter's motors, propellers, battery contacts and fluid lines, replace the cracked prop and…
Inspect the quadcopter's motors, propellers, battery contacts and fluid lines, replace the cracked prop and corroded terminal, top up gearbox oil to spec, log parts used and final readings, and mark the drone fit for flight before 16:00 today.
The tools that do the workInventory trackingESCOjob descriptionsO*NET

Signal workers to operate pumps and valves

+
Stand at the south pump house, confirm radio link with the crew, signal operator James to open valve 3 and…
Stand at the south pump house, confirm radio link with the crew, signal operator James to open valve 3 and Tom to start pump B in that order, verify oil pressure rises to 45 psi within two minutes, and report completion to control.
The tools that do the workcontrol panelsESCOjob descriptionsO*NET
The daily work20

Use automated equipment to regulate flow

+
Enable the flow automation routine, set the target throughput to 120 litres per minute, monitor the feedback…
Enable the flow automation routine, set the target throughput to 120 litres per minute, monitor the feedback loop until readings stabilise for five minutes, troubleshoot any sensor drift, and revert to manual if flow oscillates beyond ±10%.
The tools that do the workProgrammable logic controller PLCSupervisory control and data acquisition SCADAjob descriptionsO*NET

Clamp seals around valves to secure tanks.

+
Clamp the mechanical seals around the southern tank bank outlet valves A3 and A4, secure both bolts to torque…
Clamp the mechanical seals around the southern tank bank outlet valves A3 and A4, secure both bolts to torque spec, verify no leakage by a five-minute oil-circulation check, then log completion on the inventory sheet and notify maintenance.
The tools that do the workcontrol panelsO*NET

Coordinate shutdowns and major projects.

+
Coordinate the planned shutdown of Unit 2 with the turnaround team: confirm start time Tuesday 06:00, list…
Coordinate the planned shutdown of Unit 2 with the turnaround team: confirm start time Tuesday 06:00, list affected pump stations and permit holders, request isolation from the control room, and circulate the project schedule to the outage leads.
The tools that do the workSupervisory control and data acquisition SCADAO*NET

Prepare calculations for receipts and deliveries of oil and oil products.

+
Prepare the receipts and deliveries summary for last week: reconcile meter runs for tide tanks 5–8, calculate…
Prepare the receipts and deliveries summary for last week: reconcile meter runs for tide tanks 5–8, calculate net volumes after temperature correction, produce a two-line summary of discrepancies for accounting.
The tools that do the workMicrosoft ExcelO*NET
km/h RPM

Monitor process indicators, gauges, and meters

+
Monitor the process indicators for the east pipeline: watch pressure, flow and temperature gauges for 30…
Monitor the process indicators for the east pipeline: watch pressure, flow and temperature gauges for 30 minutes, flag any drift beyond normal bands, take screenshots of anomalous trends and send them to the process engineer.
The tools that do the workSupervisory control and data acquisition SCADAjob descriptions

Start pumps and open valves

+
Start pump P12 and open upstream valve V7 when tank levels are confirmed and oil circulation checked; confirm…
Start pump P12 and open upstream valve V7 when tank levels are confirmed and oil circulation checked; confirm pump run-up within 60 seconds, monitor bearing temps for five minutes, and record the start event in the control log.
The tools that do the workcontrol panelsjob descriptions

Coordinate work activities with others

+
Coordinate work activities with the mechanical crew on the dock: confirm who will isolate lines, agree a…
Coordinate work activities with the mechanical crew on the dock: confirm who will isolate lines, agree a two-hour window starting 09:00 Thursday, check permits and spare parts availability, and update the daily workboard for the shift leads.
The tools that do the workMicrosoft Outlookjob descriptions

Tend pumps that keep the circulation of oil and derived products running smoothly

+
Inspect the pump skids at Unit 3, fly the drone over each pump bay, record vibration and temperature…
Inspect the pump skids at Unit 3, fly the drone over each pump bay, record vibration and temperature readings, confirm suction and discharge pressures hold within spec, and tag any unit that needs hands-on repair before the next turnaround.
The tools that do the workProgrammable logic controller PLCcontrol panelsESCO

Monitor the flow within the pipes at a refinery

+
Fly the pipeline corridor between Tank Farm B and CDU, use the drone camera to verify flow indicators and…
Fly the pipeline corridor between Tank Farm B and CDU, use the drone camera to verify flow indicators and pigging points, cross-check abnormal flow alarms against the trending screens, and log any sections with erratic velocity or leaks for immediate isolation.
The tools that do the workSupervisory control and data acquisition SCADAESCO

Test the equipment to ensure minimum disruptions

+
Run the pre-shift test sequence on the compressor and metering skids, exercise actuators and shutdown logic,…
Run the pre-shift test sequence on the compressor and metering skids, exercise actuators and shutdown logic, capture the pass/fail results and anomaly notes, and schedule corrective maintenance if any interlocks fail the minimum disruption criteria.
The tools that do the workcontrol panelsProgrammable logic controller PLCESCO

Work from a highly automated control room

+
Manage the automated control room during the night shift: supervise running units from the operator stations,…
Manage the automated control room during the night shift: supervise running units from the operator stations, respond to any automatic trips or deviation alarms, coordinate with field techs for required manual interventions, and keep the process within safe operating envelopes.
The tools that do the workSupervisory control and data acquisition SCADAcontrol panelsESCO

Report as called for

+
Prepare the incident report after the midday feedstock switch: compile timeline of alarms and operator…
Prepare the incident report after the midday feedstock switch: compile timeline of alarms and operator actions, attach key screenshots and drone footage, quantify lost throughput and corrective hours, and send the report to the operations manager and reliability lead by end of shift.
The tools that do the workMicrosoft WordMicrosoft OutlookESCO

Verify that incoming and outgoing products are moving through the correct meters, and that meters are working properly.

+
Check that incoming and outgoing product register on the correct meters, walk the meter run to confirm each…
Check that incoming and outgoing product register on the correct meters, walk the meter run to confirm each meter tag, verify signal continuity and zero flow on the same meter when pumps are stopped, and log any discrepancies for repair before the next transfer.
The tools that do the workSupervisory control and data acquisition SCADAProgrammable logic controller PLCO*NET

Read automatic gauges at specified intervals to determine the flow rate of oil into or from tanks, and the amount of oil in tanks.

+
Read the automatic gauges on tanks and sum flow readings at 0600, 1200 and 1800 today to determine rate into…
Read the automatic gauges on tanks and sum flow readings at 0600, 1200 and 1800 today to determine rate into and out of each tank, note any suspect jumps, and flag tanks below minimum for immediate hold on receipts.
The tools that do the workSupervisory control and data acquisition SCADAInventory trackingO*NET

Lower thermometers into tanks to obtain temperature readings.

+
Lower the wetted thermometer into Tank 4 and Tank 7, wait five minutes for stable reading, record temperature…
Lower the wetted thermometer into Tank 4 and Tank 7, wait five minutes for stable reading, record temperature to the log with time and probe ID, and report any reading outside 10–60°C to operations for heating or cooling action.
The tools that do the workcontrol panelsO*NET

Record and compile operating data, instrument readings, documentation, and results of laboratory analyses.

+
Compile today’s instrument readings, lab analysis slips and operating notes into a single operating report:…
Compile today’s instrument readings, lab analysis slips and operating notes into a single operating report: enter meter totals, tank inventories and sample results, highlight out-of-spec lab values, and email the compiled report to Operations and Lab by 1700.
The tools that do the workMicrosoft ExcelMicrosoft OutlookO*NET

Inspect pipelines, tightening connections and lubricating valves as necessary.

+
Inspect the pipeline run from Pump House A to Tank Farm B, torque any loose flange bolts to spec, lubricate…
Inspect the pipeline run from Pump House A to Tank Farm B, torque any loose flange bolts to spec, lubricate valve stems showing stiffness, and photograph any corroded joints for maintenance work order submission.
The tools that do the workcontrol panelsO*NET

Calculate test result values, using standard formulas.

+
Calculate the sample test results using the standard formulas: convert gravities to API, apply concentration…
Calculate the sample test results using the standard formulas: convert gravities to API, apply concentration dilution factors, compute percent error versus standard, and append the calculation steps and final values to the lab result sheet.
The tools that do the workMicrosoft ExcelO*NET

Inventory tracking

+
complete the inventory tracking from today's flights: list batteries checked, record prop spares issued to…
complete the inventory tracking from today's flights: list batteries checked, record prop spares issued to Liam, note drone SNs taken offline, and attach incident note about gusts at West Park before closing the log
The tools that do the workInventory trackingO*NET

Inventory tracking

+
After the survey flight, upload the battery cycles, parts used, and package counts and update the inventory…
After the survey flight, upload the battery cycles, parts used, and package counts and update the inventory tracking for the drone hangar, flag missing spares and send a parts request to Maintenance Lead Sohail by 6pm.
The tools that do the workInventory trackingO*NET

Says who?

These are the pages we read to build this. Open any of them and check us.

Activities this job lives in

The human activities behind the tasks — each with its honest AI ceiling.

The logs, files & records this job keeps

Shared with other careers — the same record means something different in each.

Related careers

Same family of work — each with its own tasks and prompts.

The LLOS Work Atlas is the world's largest evidenced task library — a map of human work, with a ready prompt behind every task. 1,774 careers · every task named by the sources that witnessed it — O*NET, ESCO, real job descriptions, Wikipedia — and the deepest tasks by several at once. And it is honest about limits: where AI cannot help, the map says so.

The rest of the map

Same library, five ways in.

Copyright © LLOS.ai · 2026 — original pedagogy, voice, and design — all rights reserved.
Built on public evidence: O*NET®, ESCO, Wikipedia, U.S. Bureau of Labor Statistics, ILOSTAT. All sources & licenses