Cement Concrete Lab Technician

Cement Concrete Lab Technician executes core work activities and here are 24 real tasks that represent the job’s real output. Tasks focus on the people helped and the decisions you’ll make on shift. Each one shows where we found it, and comes with an AI prompt you can copy and use straight away.

24evidenced tasks
24ready prompts
8tools of the trade
47-2051.00O*NET-SOC code
206,170hold this job (US, BLS 2025)
$57,020median pay/yr (US)
Open Cement Concrete Lab Technician in the interactive atlas →

What it pays

Government survey numbers — not estimates, not ads.

Half of all Cement Masons and Concrete Finishers in the U.S. earn more than $57,020 a year — the middle 80% land between $39,190 and $85,480. About 206,170 people in the U.S. do this work. Figures are for the U.S. occupation group “Cement Masons and Concrete Finishers”. (U.S. Bureau of Labor Statistics survey, published 2025.) In India, Craft and related trades workers earn about ₹16,825 a month on average — around ₹2.0 lakh a year (government PLFS survey via ILOSTAT, occupation-family figure).
$57,020typical pay / year
206,170people in this work
$85,480+top 10% earn
₹2.0 lakha year in India (family avg)
Think you get this job?Six quick questions on how it really works — with a hint and the reason behind every answer.
Test yourself →

The work, task by task

These are the real jobs-to-be-done, not a wish list. Each task shows where we found it, and the prompt underneath is written for that exact task.

Make2

Screed concrete

+
Screed the slab on Bay 3 after the pour: check screed level against the control line, adjust mix for slump…
Screed the slab on Bay 3 after the pour: check screed level against the control line, adjust mix for slump 75mm, compact to specified density, record temperatures and safety checks, and sign off on the placement sheet before end of shift.
The tools that do the workHard Dollar HD Project EstimatingESCOjob descriptionsO*NETWikipedia

Mold expansion joints and edges

+
Form the expansion joints and edges on Section D: set joint spacers to 3m centres, hand-trowel edges to…
Form the expansion joints and edges on Section D: set joint spacers to 3m centres, hand-trowel edges to specified radius, install joint filler to depth, note any deviations on the QA checklist, and photograph for the job file.
The tools that do the workLogicSphere Firstmixjob descriptionsO*NETWikipedia
Fixing3

Apply sealants or waterproofing

+
Apply the waterproof sealant to the test slab A7: ensure surface is clean and dry, mask adjacent areas, apply…
Apply the waterproof sealant to the test slab A7: ensure surface is clean and dry, mask adjacent areas, apply two coats with the specified coverage rate, measure cure times, and log product batch and inspection notes.
The tools that do the workHIPERPAVjob descriptionsO*NET

Cut concrete

+
Cut control joints in the north slab at 24 hours: verify slab strength, mark cut lines per drawing, use the…
Cut control joints in the north slab at 24 hours: verify slab strength, mark cut lines per drawing, use the wet saw with dust suppression, set depth to one-quarter slab thickness, collect and record photos and cut times in the job log.
The tools that do the workNational Concrete & Masonry EstimatorESCOO*NET

Level concrete

+
Level the freshly placed slab along the southeast form line using the laser level and straightedge, check…
Level the freshly placed slab along the southeast form line using the laser level and straightedge, check slump and screed heights every 300mm, correct low spots with additional mix, and record test locations and readings before finishing.
The tools that do the workShilstone seeMIXESCOWikipedia
The daily work19

Monitor the effects of weather on curing

+
Monitor the slab curing through the next three days, log air and surface temperature and humidity hourly,…
Monitor the slab curing through the next three days, log air and surface temperature and humidity hourly, note rain or wind events, flag any freeze or dew risk to the foreman and recommend curing blanket or accelerator by 10:00 each morning.
The tools that do the workHIPERPAVjob descriptionsO*NET

Signal truck drivers and move chute

+
Stand at the east delivery gate, signal the concrete mixer drivers into position, guide each truck to the…
Stand at the east delivery gate, signal the concrete mixer drivers into position, guide each truck to the pour point, instruct the driver to straighten and lock the chute, and shift the chute as needed to keep the pour continuous and the forms level.
The tools that do the workLogicSphere Firstmixjob descriptionsO*NET

Grind and polish surfaces

+
Prepare for finishing by grinding and polishing the test slab surface until the specified profile is…
Prepare for finishing by grinding and polishing the test slab surface until the specified profile is achieved, check flatness with straightedge and feel, clean slurry, and record grit progression and final surface texture in the slab report.
The tools that do the workShilstone seeMIXjob descriptionsO*NET

Operate power vibrator to compact concrete.

+
Operate the power vibrator across the pour, maintain vibrator amplitude and immersion time to consolidate…
Operate the power vibrator across the pour, maintain vibrator amplitude and immersion time to consolidate without segregation, monitor form vibration response, and log locations and duration of vibration for quality control.
The tools that do the workADAPT-ModelerO*NET

Clean chipped area, using wire brush, and feel and observe surface to determine if it is rough or uneven.

+
Clean the chipped area with a wire brush, remove loose particles, run fingers and the straightedge over the…
Clean the chipped area with a wire brush, remove loose particles, run fingers and the straightedge over the patch to judge roughness and level, then report whether grinding or patching is required and estimate material needed.
The tools that do the workACT Contractors FormsO*NET

Cut metal division strips, and press them into terrazzo base so that top edges form desired design or pattern.

+
Measure and cut the metal division strips to the layout lines, press each strip into the terrazzo base so top…
Measure and cut the metal division strips to the layout lines, press each strip into the terrazzo base so top edges follow the pattern, check alignment and secure ends, then note strip lengths and any waste for the materials log.
The tools that do the workNational Concrete & Masonry EstimatorO*NET

Push roller over surface to embed chips in surface.

+
Roll the hand roller over the aggregate-strewn test panel repeatedly until chips are uniformly embedded and…
Roll the hand roller over the aggregate-strewn test panel repeatedly until chips are uniformly embedded and flush with the cement paste, check for popouts, and note compaction passes and any surface bleeding on the batch log.
The tools that do the workShilstone seeMIXO*NET

Apply muriatic acid to clean surface, and rinse with water.

+
Put on acid-resistant gloves, goggles and respirator, apply a light coat of muriatic acid to the stained test…
Put on acid-resistant gloves, goggles and respirator, apply a light coat of muriatic acid to the stained test slab, scrub gently with a nylon brush, rinse thoroughly with potable water until neutral, and record the condition and rinse volume on the test sheet.
The tools that do the workLogicSphere FirstmixO*NET

Spread roofing paper on surface of foundation, and spread concrete onto roofing paper with trowel to form terrazzo base.

+
Roll out roofing felt over the foundation area, tape laps and seal edges, then screed the prepared terrazzo…
Roll out roofing felt over the foundation area, tape laps and seal edges, then screed the prepared terrazzo mix onto the paper, float and trowel to a uniform base thickness and note thickness and cure start time in the location log.
The tools that do the workACT Contractors FormsO*NET

Read blueprints or drawings to calculate materials

+
Study the foundation blueprints, take off slab dimensions and rebar schedules, calculate required cement,…
Study the foundation blueprints, take off slab dimensions and rebar schedules, calculate required cement, sand, and aggregate quantities for each pour, and prepare a materials list with waste allowance for procurement by Friday.
The tools that do the workHard Dollar HD Project Estimatingjob descriptions

Lay out patterns, forms, or foundations

+
Mark control lines and batter boards per the site plan, snap chalk lines for footings, set and brace forms to…
Mark control lines and batter boards per the site plan, snap chalk lines for footings, set and brace forms to those lines, confirm corners and diagonals, then record offsets and form elevations on the layout sheet for the foreman.
The tools that do the workADAPT-Modelerjob descriptions

Align structures using levels and plumbs

+
Set the slab screed elevation with the survey level and plumb checks, adjust form heights until level and…
Set the slab screed elevation with the survey level and plumb checks, adjust form heights until level and plumb agree, recheck across three control points, then log final elevations and any shimming used on the control sheet.
The tools that do the workLogicSphere Firstmixjob descriptions

Lay out and install rain screen water systems

+
Lay out, level, and fasten the rain screen water-resistive channels and flashing around the west stairwell,…
Lay out, level, and fasten the rain screen water-resistive channels and flashing around the west stairwell, confirm 10mm gap and continuous drainage path, install sealant and backer rod, then record as-built measurements and photos for QA before noon today.
The tools that do the workADAPT-Modelerjob descriptions

Install reinforcing rebar or mesh wire

+
Measure and mark the slab grid, cut and bend the reinforcing bars to the specified lengths, place chairs for…
Measure and mark the slab grid, cut and bend the reinforcing bars to the specified lengths, place chairs for 50mm cover, tie intersections per structural notes on grid B2, inspect lap splices, and log RFIs if spacing conflicts are found.
The tools that do the workLogicSphere Firstmixjob descriptions

Create broom finishes to prevent slipping

+
Finish the curing slab with a broom texture across the public walkway between bays 3 and 4, timing passes to…
Finish the curing slab with a broom texture across the public walkway between bays 3 and 4, timing passes to start at plastic set, keep broom strokes perpendicular to traffic flow, photograph finished surface, and note ambient temp and cure start time.
The tools that do the workShilstone seeMIXWikipedia

Apply stamp finishes for aesthetic purposes

+
Set and press the pattern mats over the new patio slab after bleed water dissipates, align joints to the…
Set and press the pattern mats over the new patio slab after bleed water dissipates, align joints to the brick bond, apply release agent, stamp in sequence to avoid cold joints, then record pattern layout and client signoff photos.
The tools that do the workNational Concrete & Masonry EstimatorWikipedia

Put up any removable forms

+
Assemble and secure removable timber forms for the column footings on grid line C, check batter boards and…
Assemble and secure removable timber forms for the column footings on grid line C, check batter boards and levels, ensure ties are accessible for removal, schedule form stripping at 48 hours or when compressive tests allow, then log dimensions.
The tools that do the workHard Dollar HD Project EstimatingESCO

Chamfer concrete

+
Rout chamfers on exposed slab edges to 12mm by 12mm with a bullnose tool after initial set, verify…
Rout chamfers on exposed slab edges to 12mm by 12mm with a bullnose tool after initial set, verify straightness with a profile gauge, remove debris, note any honeycombing for repair, and photograph edges for the quality log.
The tools that do the workTradesman's Software Master EstimatorESCO

Contractors forms

+
complete the contractors forms for batch 47 concrete pours, record mix IDs, sample numbers, test dates,…
complete the contractors forms for batch 47 concrete pours, record mix IDs, sample numbers, test dates, acceptance values and the lab technician initials, then file the forms with project 12B quality records.
The tools that do the workACT Contractors FormsO*NET

Says who?

These are the pages we read to build this. Open any of them and check us.

The logs, files & records this job keeps

Shared with other careers — the same record means something different in each.

Related careers

Same family of work — each with its own tasks and prompts.

The LLOS Work Atlas is the world's largest evidenced task library — a map of human work, with a ready prompt behind every task. 1,774 careers · every task named by the sources that witnessed it — O*NET, ESCO, real job descriptions, Wikipedia — and the deepest tasks by several at once. And it is honest about limits: where AI cannot help, the map says so.

The rest of the map

Same library, five ways in.

Copyright © LLOS.ai · 2026 — original pedagogy, voice, and design — all rights reserved.
Built on public evidence: O*NET®, ESCO, Wikipedia, U.S. Bureau of Labor Statistics, ILOSTAT. All sources & licenses