Water Features Technician

Water Features Technician carries out essential functions and this page lists 23 real tasks to illustrate what success looks like. Each task reveals who you coordinate with and what evidence guides choices. Each one shows where we found it, and comes with an AI prompt you can copy and use straight away.

23evidenced tasks
23ready prompts
7tools of the trade
17-3024.00O*NET-SOC code
15,520hold this job (US, BLS 2025)
$73,900median pay/yr (US)
Open Water Features Technician in the interactive atlas →

What it pays

Government survey numbers — not estimates, not ads.

Half of all Electro-Mechanical and Mechatronics Technologists and Technicians in the U.S. earn more than $73,900 a year — the middle 80% land between $47,840 and $109,890. About 15,520 people in the U.S. do this work. Figures are for the U.S. occupation group “Electro-Mechanical and Mechatronics Technologists and Technicians”. (U.S. Bureau of Labor Statistics survey, published 2025.) In India, Professionals earn about ₹38,298 a month on average — around ₹4.6 lakh a year (government PLFS survey via ILOSTAT, occupation-family figure).
$73,900typical pay / year
15,520people in this work
$109,890+top 10% earn
₹4.6 lakha year in India (family avg)
Think you get this job?Six quick questions on how it really works — with a hint and the reason behind every answer.
Test yourself →

The work, task by task

These are the real jobs-to-be-done, not a wish list. Each task shows where we found it, and the prompt underneath is written for that exact task.

Learning1

Test EM games to ensure proper functioning

+
Run the electromagnetic games on the fountain control rack for a full cycle, record coil voltages, motor…
Run the electromagnetic games on the fountain control rack for a full cycle, record coil voltages, motor currents and timing, flag any anomaly that trips the safety interlock, and file a short report with photos for the engineers by end of day Thursday.
The tools that do the workPythonjob descriptionsO*NETWikipedia
Make2

Assist engineers in testing robotics equipment

+
Help the lead engineer bench-test the robotic actuator rigs today: wire the torque sensors, verify encoder…
Help the lead engineer bench-test the robotic actuator rigs today: wire the torque sensors, verify encoder counts, follow the test script, note any binding or unexpected heat, and hand the annotated log and failed parts to engineering before shift change.
The tools that do the workMicrosoft ExcelESCOjob descriptionsO*NET

Prepare documents detailing the assembly process and other technical specifications

+
Draft the assembly instructions for the new pump module: step-by-step fitted assembly, torque specs, wiring…
Draft the assembly instructions for the new pump module: step-by-step fitted assembly, torque specs, wiring diagram, exploded parts list, and a hazards section about banned materials; deliver a print-ready spec sheet and PDF to engineering by Wednesday noon.
The tools that do the workMicrosoft WordESCOO*NET
Fixing2

Develop, test, or program new robots.

+
Develop and bench-run control code for the new maintenance robot: implement motion routines, safety limits,…
Develop and bench-run control code for the new maintenance robot: implement motion routines, safety limits, and motor PID loops, simulate a 30‑minute run, log faults, and hand over source, compiled build, and test log to engineering at week’s end.
The tools that do the workC++job descriptionsO*NET

Replace faulty electronic and mechanical parts

+
Diagnose the fountain at the service call, remove the faulty pump or control, replace the electronic board…
Diagnose the fountain at the service call, remove the faulty pump or control, replace the electronic board and worn seals with compliant parts, bench-test the assembly for 30 minutes, update the asset file with parts and serial numbers, and file the safety compliance note before invoicing.
The tools that do the workMicrosoft ExcelMicrosoft Wordjob descriptionsO*NETWikipedia
The daily work18

Install or program computer hardware or machine or instrumentation software in microprocessor-based systems.

+
Install the control board and connect the sensor harness on Fountain A's pump bank, load the latest firmware,…
Install the control board and connect the sensor harness on Fountain A's pump bank, load the latest firmware, set the motor drive parameters to the documented torque limits, then run the start-up sequence and log any fault codes and baseline readings.
The tools that do the workLinuxO*NET

Inspect parts for surface defects.

+
Inspect the spare nozzle set and pump impellers delivered today for scratches, pits, or corrosion under 10x…
Inspect the spare nozzle set and pump impellers delivered today for scratches, pits, or corrosion under 10x magnification, photograph each defect with scale, tag defective items, and email the rejection list to Purchasing and Mark in Maintenance.
The tools that do the workMicrosoft WordMicrosoft OutlookO*NET
km/h RPM

Verify part dimensions or clearances to ensure conformance to specifications, using precision measuring instruments.

+
Measure the bearing housing bores and shaft clearances on fountain unit C7 with micrometer and bore gauge,…
Measure the bearing housing bores and shaft clearances on fountain unit C7 with micrometer and bore gauge, record three measurements each side, compare to the drawing tolerances, flag any out-of-spec readings and order replacement parts if beyond service limits.
The tools that do the workDassault Systemes SolidWorksO*NET

Establish and maintain inventory, records, or documentation systems.

+
Create and maintain a parts log for Site East with part numbers, locations, quantities, last service date,…
Create and maintain a parts log for Site East with part numbers, locations, quantities, last service date, and reorder thresholds, upload the current audit sheet, reconcile discrepancies with the storeroom, and circulate the updated inventory to Operations every Monday.
The tools that do the workMicrosoft ExcelO*NET

Determine whether selected electromechanical components comply with environmental standards and regulations.

+
Review the specifications for the new fountain lighting drivers and verify they contain no restricted…
Review the specifications for the new fountain lighting drivers and verify they contain no restricted substances, check supplier declarations against the local environmental list, document compliance or nonconformance, and send the report to Compliance and Procurement.
The tools that do the workMicrosoft WordO*NET

Develop or implement programs related to the environmental impact of engineering activities.

+
Draft and run a site program to reduce chemical discharge from the west basin by 30 percent over six months,…
Draft and run a site program to reduce chemical discharge from the west basin by 30 percent over six months, list proposed process changes, monitoring metrics, and a sampling plan, then submit the draft to Sarah in Sustainability for review.
The tools that do the workPythonO*NET

Conduct statistical studies to analyze or compare production costs for sustainable and nonsustainable designs.

+
Run a cost-comparison study of our three fountain designs, pulling six months of material, labor and energy…
Run a cost-comparison study of our three fountain designs, pulling six months of material, labor and energy spend, calculate unit cost per installation for sustainable versus conventional options, and produce a one-page recommendation with confidence intervals by Friday.
The tools that do the workMicrosoft ExcelMicrosoft WordO*NET

Specify, coordinate, or conduct quality-control or quality-assurance programs and procedures.

+
Draft and circulate the updated quality-control checklist for fountain fabrication, schedule on-site QA…
Draft and circulate the updated quality-control checklist for fountain fabrication, schedule on-site QA inspections for next two production runs with criteria for welds, coatings and motor tests, and compile nonconformance log with corrective actions by end of month.
The tools that do the workMicrosoft WordMicrosoft OutlookO*NET

Operate metalworking machines to fabricate housings, jigs, fittings, or fixtures.

+
Lay out the fabrication steps and machine settings to produce the new stainless steel pump housing, list…
Lay out the fabrication steps and machine settings to produce the new stainless steel pump housing, list required jigs and fixtures, assign machine shop shifts and create a materials and tooling pickup list to hand to the machinist tomorrow morning.
The tools that do the workDassault Systemes SolidWorksO*NET

Identify energy-conserving production or fabrication methods, such as by bending metal rather than cutting and welding or casting metal.

+
Survey current shop processes, identify three fabrication changes that save energy—such as using bending…
Survey current shop processes, identify three fabrication changes that save energy—such as using bending sequences to reduce welding—estimate hourly energy and labor savings for each, and recommend which to pilot next quarter with expected payback periods.
The tools that do the workMicrosoft ExcelO*NET

Adjust unmanned, automated, servomechanical, or electromechanical systems

+
Run diagnostics on the unattended recirculation system at Plaza B, list failed sensors or drive faults, apply…
Run diagnostics on the unattended recirculation system at Plaza B, list failed sensors or drive faults, apply the control offsets to restore correct pump RPMs, and record steps and test results so operations can clear the alarm log before opening tomorrow.
The tools that do the workLinuxjob descriptions

Troubleshoot electrical and mechanical issues in EM games

+
Troubleshoot the electromagnetic game cabinet that trips under load: isolate whether the fault is in the…
Troubleshoot the electromagnetic game cabinet that trips under load: isolate whether the fault is in the drive electronics or motor winding, log oscilloscope and insulation readings, replace the failed component, and verify game runs through full cycle without faults tonight.
The tools that do the workC++Wikipedia

Install and set up EM game components and systems

+
Install the EM game cabinet at Pier 4, mount the power and control rack, wire the motors and sensors to the…
Install the EM game cabinet at Pier 4, mount the power and control rack, wire the motors and sensors to the terminal block, verify earth and fuse ratings meet site spec, then bench-run the full sequence until the firing solenoid cycles reliably.
The tools that do the workLinuxWikipedia

Calibrate sensors and targets in light gun and simulation games

+
Calibrate the light-gun array on Bay 2 by aligning each sight with the fixed targets, adjust sensor…
Calibrate the light-gun array on Bay 2 by aligning each sight with the fixed targets, adjust sensor thresholds until hit registration is consistent at three metres under ambient park lighting, log offsets and timeout values, and run ten consecutive validation runs.
The tools that do the workC++Wikipedia

Document maintenance procedures and repairs performed

+
Record the maintenance performed on Fountain A: list removed parts, torque checks, motor brush life, replaced…
Record the maintenance performed on Fountain A: list removed parts, torque checks, motor brush life, replaced seals and the safety tests run; attach photos, note part numbers and return-to-service time, then file the entry in the maintenance log for supervisor review.
The tools that do the workMicrosoft WordMicrosoft OutlookWikipedia

Make draughts and prepare documents detailing the material requisitions

+
Draft the material requisition for the next fabrication run: list quantities of brass nozzles, neoprene…
Draft the material requisition for the next fabrication run: list quantities of brass nozzles, neoprene seals, motor brushes, their part numbers, unit costs, and lead times, annotate substitutions that meet banned-material rules, and prepare the approval page for procurement sign-off by Friday.
The tools that do the workMicrosoft ExcelMicrosoft WordESCO

Test and evaluate the prototypes

+
Run the prototype on the test rig for two hours under full load, record vibration, temperature and flow…
Run the prototype on the test rig for two hours under full load, record vibration, temperature and flow readings every ten minutes, note any unexpected noise or brush sparking, compare measured values to the design targets, and recommend go/no-go with specific fixes if limits are exceeded.
The tools that do the workPythonESCO

Oversee the manufacturing process

+
Oversee the workshop run of thirty units: verify assembly jigs are set to tolerance, spot-check three units…
Oversee the workshop run of thirty units: verify assembly jigs are set to tolerance, spot-check three units per hour for alignment and electrical continuity, enforce banned-material checks at packing, and update the production log with any nonconformances for corrective action.
The tools that do the workMicrosoft ExcelESCO

Says who?

These are the pages we read to build this. Open any of them and check us.

The logs, files & records this job keeps

Shared with other careers — the same record means something different in each.

Related careers

Same family of work — each with its own tasks and prompts.

The LLOS Work Atlas is the world's largest evidenced task library — a map of human work, with a ready prompt behind every task. 1,774 careers · every task named by the sources that witnessed it — O*NET, ESCO, real job descriptions, Wikipedia — and the deepest tasks by several at once. And it is honest about limits: where AI cannot help, the map says so.

The rest of the map

Same library, five ways in.

Copyright © LLOS.ai · 2026 — original pedagogy, voice, and design — all rights reserved.
Built on public evidence: O*NET®, ESCO, Wikipedia, U.S. Bureau of Labor Statistics, ILOSTAT. All sources & licenses