Wind Farm Supervisor

Wind Farm Supervisor provides hands-on help and checks outcomes with 21 realistic tasks drawn from the field. The tasks reveal typical rhythms, possible surprises, and what beginners should practice first. Each one shows where we found it, and comes with an AI prompt you can copy and use straight away.

21evidenced tasks
21ready prompts
10tools of the trade
11-9199.09O*NET-SOC code
622,190hold this job (US, BLS 2025)
$141,900median pay/yr (US)
Open Wind Farm Supervisor in the interactive atlas →

What it pays

Government survey numbers — not estimates, not ads.

Half of all Managers, All Other in the U.S. earn more than $141,900 a year — the middle 80% land between $74,300 and $238,270. About 622,190 people in the U.S. do this work. Figures are for the U.S. occupation group “Managers, All Other”. (U.S. Bureau of Labor Statistics survey, published 2025.) In India, Managers earn about ₹50,473 a month on average — around ₹6.1 lakh a year (government PLFS survey via ILOSTAT, occupation-family figure).
$141,900typical pay / year
622,190people in this work
$238,270+top 10% earn
₹6.1 lakha year in India (family avg)
Think you get this job?Six quick questions on how it really works — with a hint and the reason behind every answer.
Test yourself →

The work, task by task

These are the real jobs-to-be-done, not a wish list. Each task shows where we found it, and the prompt underneath is written for that exact task.

Keeping the record1

Manage budgets

+
Update the monthly operations budget with March actuals, reallocate 20,000 for unexpected gearbox repairs,…
Update the monthly operations budget with March actuals, reallocate 20,000 for unexpected gearbox repairs, flag any line items over 10 percent variance, and send the revised budget to Rachel in finance and to plant manager Omar by Tuesday for approval.
The tools that do the workSAPjob descriptionsO*NET
Analysing1

Monitor turbine performance data

+
Pull the last 72 hours of SCADA and vibration logs, highlight any turbines with sustained power loss or…
Pull the last 72 hours of SCADA and vibration logs, highlight any turbines with sustained power loss or rising vibration trends above alarm thresholds, attach trend charts and send to maintenance lead Javier and to engineering by end of shift for root-cause triage.
The tools that do the workComputerized diagnosticjob descriptionsO*NET
Coordinate1

Oversee personnel

+
Publish next week’s on-site shift roster reflecting two technicians on call, assign senior tech Lina to…
Publish next week’s on-site shift roster reflecting two technicians on call, assign senior tech Lina to turbine 12 overhaul, note Jane as trainee shadowing, then notify all staff and upload the roster to the crew hub by 18:00 Friday.
The tools that do the workEmployee schedulingjob descriptionsO*NET
Negotiating1

Communicate with stakeholders

+
Draft a short briefing summarising last month’s availability, the three active faults, containment actions…
Draft a short briefing summarising last month’s availability, the three active faults, containment actions taken, and the proposed repair timeline, then send it with the latest availability chart to landowner liaison Priya and to the regional operations director by Thursday noon.
The tools that do the workMicrosoft WordMicrosoft Outlookjob descriptionsO*NET
The daily work17

Estimate costs associated with operations, including repairs or preventive maintenance.

+
Estimate the next 12 months of operational costs for the farm, itemise routine preventive maintenance, major…
Estimate the next 12 months of operational costs for the farm, itemise routine preventive maintenance, major repair contingencies, spare-parts consumption and labour days, and produce a cost schedule I can show finance by Monday.
The tools that do the workMicrosoft ExcelO*NET

Review, negotiate, or approve wind farm contracts.

+
Review the turbine service contract from NordWind, propose changes to liability caps, response times and…
Review the turbine service contract from NordWind, propose changes to liability caps, response times and spare-parts allowances, and return a tracked version with negotiation points for legal and procurement by Thursday.
The tools that do the workMicrosoft WordMicrosoft OutlookO*NET

Manage warranty repair or replacement services.

+
Manage outstanding warranty repairs: assign each claim to the OEM contact with the inspection reports and…
Manage outstanding warranty repairs: assign each claim to the OEM contact with the inspection reports and failure codes, set target resolution dates, and tell logistics to hold replacement parts until claims are approved.
The tools that do the workComputerized maintenance management system CMMSO*NET

Coordinate repairs

+
Coordinate repair work on Turbine 17: confirm approved scope with the crew lead, schedule crane and…
Coordinate repair work on Turbine 17: confirm approved scope with the crew lead, schedule crane and technician windows, log permit-to-work start and expected completion in the maintenance log, and notify the grid operator of planned downtime.
The tools that do the workEmployee schedulingComputerized maintenance management system CMMSjob descriptions

Plan long-term operational strategies

+
Draft a three-year operations plan that reduces unplanned downtime by 20 percent, outlines preventive…
Draft a three-year operations plan that reduces unplanned downtime by 20 percent, outlines preventive maintenance cadence, spare-parts stocking policy, and a training schedule for technicians, and circulate to the regional manager by next Friday.
The tools that do the workMicrosoft PowerPointMicrosoft Exceljob descriptions

Inspect equipment for wear and tear

+
Inspect the nacelle and rotor of Turbine 04 today, record bearing temperatures, blade erosion, oil sample…
Inspect the nacelle and rotor of Turbine 04 today, record bearing temperatures, blade erosion, oil sample results and safety observations, grade the urgency of repairs, and upload the completed inspection report to the asset log before shift end.
The tools that do the workComputerized diagnosticComputerized maintenance management system CMMSjob descriptions

Analyze weather conditions

+
Check the latest three-day and hourly forecasts for the farm, flag any periods with gusts over 25 m/s or…
Check the latest three-day and hourly forecasts for the farm, flag any periods with gusts over 25 m/s or icing risk, and produce a single-page briefing with recommended turbine curtailment windows for the operations team by 07:00 tomorrow.
The tools that do the workComputerized diagnosticjob descriptions

Ensure turbines operate efficiently

+
Run a seven-day performance check across all turbines, highlight machines underperforming by more than 8…
Run a seven-day performance check across all turbines, highlight machines underperforming by more than 8 percent versus their power curves, list suspected causes and schedule targeted inspections for tomorrow morning with the operations crew.
The tools that do the workComputerized maintenance management system CMMSComputerized diagnosticjob descriptions

Review operational reports

+
Review last week's daily operational logs and the SCADA summary, extract capacity factor, downtime hours and…
Review last week's daily operational logs and the SCADA summary, extract capacity factor, downtime hours and top three fault codes, then write a two-paragraph summary for the morning meeting noting trends and recommended fixes.
The tools that do the workComputerized diagnosticMicrosoft Wordjob descriptions

Ensure safety compliance

+
Audit all maintenance records and recent safety observations for the past quarter, identify any recurring…
Audit all maintenance records and recent safety observations for the past quarter, identify any recurring noncompliance items, link them to responsible crews, and draft corrective actions with deadlines for review at Friday's safety committee.
The tools that do the workGensuiteComputerized maintenance management system CMMSjob descriptions

Design wind energy farms and equipment

+
Produce preliminary layouts and a component list for a 15 MW extension using 3.6 MW turbines, include…
Produce preliminary layouts and a component list for a 15 MW extension using 3.6 MW turbines, include expected clearances, access roads and crane pads, and estimate basic civil and electrical costs for the planning meeting next Wednesday.
The tools that do the workAutodesk AutoCADESCO

Research locations to find the most productive site

+
Compile wind shear, turbulence intensity and mean wind speed records for the past two years at the candidate…
Compile wind shear, turbulence intensity and mean wind speed records for the past two years at the candidate sites, score each site by expected annual energy yield and logistics difficulty, and recommend the top site with rationale by Monday noon.
The tools that do the workMicrosoft ExcelESCO

Develop strategies for environmental sustainability

+
Create a three-point plan to cut habitat disturbance, reduce bird and bat collisions, and lower noise impact…
Create a three-point plan to cut habitat disturbance, reduce bird and bat collisions, and lower noise impact across the site this year, include who owns each action, required permits, measurable KPIs, and a March pilot to test one mitigation.
The tools that do the workGensuiteESCO

Adjust engineering designs

+
Update the nacelle access layout and blade pitch actuator mounting detail to resolve clearance issues found…
Update the nacelle access layout and blade pitch actuator mounting detail to resolve clearance issues found during last week’s inspection, produce marked-up drawings, list parts that change, and request engineering review by Thursday.
The tools that do the workAutodesk AutoCADESCOsee the evidence ↗

Mining, construction and civil engineering machinery products

+
Compile a procurement-ready spec sheet for the new crane, foundation drill rig, and transport trailers we…
Compile a procurement-ready spec sheet for the new crane, foundation drill rig, and transport trailers we need for the summer upgrade, include lifting charts, ground-bearing requirements, and three supplier alternatives with lead times.
The tools that do the workMicrosoft ExcelESCOsee the evidence ↗

Design wind turbines

+
Develop a concept layout for a 3.6 MW turbine variant with modified hub height and rotor diameter to improve…
Develop a concept layout for a 3.6 MW turbine variant with modified hub height and rotor diameter to improve low-wind performance, include estimated power curve, rough mass/safety implications, and ask design review meeting next Monday.
The tools that do the workAutodesk AutoCADMicrosoft ExcelESCOsee the evidence ↗

Employee scheduling

+
Publish next week's employee scheduling for the White Hill turbine crew, lock in two daytime technicians for…
Publish next week's employee scheduling for the White Hill turbine crew, lock in two daytime technicians for Monday and Thursday, note Kenji's training on Tuesday, and circulate the final roster to HR and maintenance by Friday noon.
The tools that do the workEmployee schedulingO*NET

Says who?

These are the pages we read to build this. Open any of them and check us.

The logs, files & records this job keeps

Shared with other careers — the same record means something different in each.

Related careers

Same family of work — each with its own tasks and prompts.

The LLOS Work Atlas is the world's largest evidenced task library — a map of human work, with a ready prompt behind every task. 1,774 careers · every task named by the sources that witnessed it — O*NET, ESCO, real job descriptions, Wikipedia — and the deepest tasks by several at once. And it is honest about limits: where AI cannot help, the map says so.

The rest of the map

Same library, five ways in.

Copyright © LLOS.ai · 2026 — original pedagogy, voice, and design — all rights reserved.
Built on public evidence: O*NET®, ESCO, Wikipedia, U.S. Bureau of Labor Statistics, ILOSTAT. All sources & licenses