What it pays
Government survey numbers — not estimates, not ads.
The work, task by task
These are the real jobs-to-be-done, not a wish list. Each task shows where we found it, and the prompt underneath is written for that exact task.
Screed concrete
+Screed the fresh concrete between the forms along the patio run from the garage to the sidewalk, using the…
Screed concrete
+Pour concrete into the forms
+Pour concrete into the garage slab forms starting at the far corner, keep a steady flow to avoid cold joints,…
Pour concrete into the forms
+Mold expansion joints and edges
+Form and strike expansion joints and run neat, rounded edges on the driveway slab every four feet and at all…
Mold expansion joints and edges
+Apply sealants or waterproofing
+Cut control joints in the new sidewalk within 24 hours using a wet saw set to one-quarter depth at the marked…
Apply sealants or waterproofing
+Cut concrete
+Strike and level the slab surface after screeding with a magnesium float and then a straightedge, check with…
Cut concrete
+Level concrete
+Apply a clear waterproofing coat to the cured foundation wall from grade to two feet up, brush into joints…
Level concrete
+Monitor the effects of weather on curing
+Check the curing slab every two hours while temperature and humidity change, note surface bleed and hairline…
Monitor the effects of weather on curing
+Signal truck drivers and move chute
+Stand at the pour edge, give clear hand and radio signals to the ready truck driver to stop or advance, then…
Signal truck drivers and move chute
+Grind and polish surfaces
+Grind the surface with progressively finer diamonds until the sheen and flatness meet the mockup, vacuum and…
Grind and polish surfaces
+Operate power vibrator to compact concrete.
+Hold the vibrator at one-second intervals along the form face, watch concrete slump and bleeding, avoid…
Operate power vibrator to compact concrete.
+Clean chipped area, using wire brush, and feel and observe surface to determine if it is rough or uneven.
+Wire-brush the chipped area, remove loose particles, run your hand and straightedge over the patch to judge…
Clean chipped area, using wire brush, and feel and observe surface to determine if it is rough or uneven.
+Cut metal division strips, and press them into terrazzo base so that top edges form desired design or pattern.
+Measure and cut metal division strips to the layout, press each strip into the fresh terrazzo so the top edge…
Cut metal division strips, and press them into terrazzo base so that top edges form desired design or pattern.
+Push roller over surface to embed chips in surface.
+Push the heavy roller over the newly laid terrazzo surface in overlapping passes until chips sit evenly…
Push roller over surface to embed chips in surface.
+Apply muriatic acid to clean surface, and rinse with water.
+Don full-face respirator, acid-resistant gloves and splash suit, apply muriatic acid evenly across the slab…
Apply muriatic acid to clean surface, and rinse with water.
+Spread roofing paper on surface of foundation, and spread concrete onto roofing paper with trowel to form terrazzo base.
+Lay roofing paper smooth across the foundation, lap seams and tape, then comb a scratch coat of fresh…
Spread roofing paper on surface of foundation, and spread concrete onto roofing paper with trowel to form terrazzo base.
+Read blueprints or drawings to calculate materials
+Study the blueprint elevations and plan view, take on-site measurements, tabulate block, mortar and rebar…
Read blueprints or drawings to calculate materials
+Lay out patterns, forms, or foundations
+Stake reference lines, set form edges to the layout dimensions, measure diagonals and adjust until corner…
Lay out patterns, forms, or foundations
+Align structures using levels and plumbs
+Align each course as you lay block or stone, plumb and level each unit, shim or shave until vertical and…
Align structures using levels and plumbs
+Lay out and install rain screen water systems
+Layout the rain screen cavity and flashing runs on the east wall, mark stud locations and weep holes, install…
Lay out and install rain screen water systems
+Install reinforcing rebar or mesh wire
+Mark and cut rebar lengths for the footing and stemwall, set and tie the vertical and horizontal bars to the…
Install reinforcing rebar or mesh wire
+Create broom finishes to prevent slipping
+After floating the slab, run the broom with consistent strokes across the walkway to create a fine, non-slip…
Create broom finishes to prevent slipping
+Apply stamp finishes for aesthetic purposes
+Position the pattern rollers and stamps on the green concrete, press and lift in sequence to match the…
Apply stamp finishes for aesthetic purposes
+Put up any removable forms
+Set the removable form panels plumb and level on the column runs, secure with ties and wedges, check…
Put up any removable forms
+Chamfer concrete
+Form the chamfer profiles on all exposed concrete edges with the hand guards, maintain consistent radius with…
Chamfer concrete
+Contractors forms
+Record the new poured foundation job on contractors forms for 42 Pine Street: list materials, crew hours,…
Contractors forms
+Says who?
These are the pages we read to build this. Open any of them and check us.
Activities this job lives in
The human activities behind the tasks — each with its honest AI ceiling.
The logs, files & records this job keeps
Shared with other careers — the same record means something different in each.
Related careers
Same family of work — each with its own tasks and prompts.
The rest of the map
Same library, five ways in.
Built on public evidence: O*NET®, ESCO, Wikipedia, U.S. Bureau of Labor Statistics, ILOSTAT. All sources & licenses