What it pays
Government survey numbers — not estimates, not ads.
Half of all Solar Photovoltaic Installers in the U.S. earn more than $53,140 a year — the middle 80% land between $41,600 and $79,970. About 31,350 people in the U.S. do this work. Figures are for the U.S. occupation group “Solar Photovoltaic Installers”. (U.S. Bureau of Labor Statistics survey, published 2025.) In India, Craft and related trades workers earn about ₹16,825 a month on average — around ₹2.0 lakh a year (government PLFS survey via ILOSTAT, occupation-family figure).
$53,140typical pay / year
31,350people in this work
$79,970+top 10% earn
₹2.0 lakha year in India (family avg)
Think you get this job?Six quick questions on how it really works — with a hint and the reason behind every answer.
Test yourself →The work, task by task
These are the real jobs-to-be-done, not a wish list. Each task shows where we found it, and the prompt underneath is written for that exact task.
Fixing3
Maintain and troubleshoot PV systems
+Record the system fault reported at 412 Maple Street, inspect the inverter, combiner, and string continuity,…
Maintain and troubleshoot PV systems
+Record the system fault reported at 412 Maple Street, inspect the inverter, combiner, and string continuity, note open or reversed circuits, propose parts or wiring changes, and schedule a follow-up visit if rooftop access or replacement modules are required by Thursday.
The tools that do the workSalesforcejob descriptionsO*NET
Pasted it? Good. When the reply comes back, push once: ask it to sharpen the weakest part. — Did this prompt help?
Connect PV panels to electrical systems
+Terminate output cables from the array to the AC combiner at 77 Cedar Court, torque all lugs to spec, install…
Connect PV panels to electrical systems
+Terminate output cables from the array to the AC combiner at 77 Cedar Court, torque all lugs to spec, install the labelled DC disconnect, verify polarity at each string, and update the single-line diagram to show the new conduit routing before energising.
The tools that do the workMicrosoft OfficeESCOjob descriptions
Pasted it? Good. When the reply comes back, push once: ask it to sharpen the weakest part. — Did this prompt help?
Check electrical wiring, polarity, and grounding
+Perform a continuity check and insulation resistance test on the main PV feeder at 101 Birch Road, confirm…
Check electrical wiring, polarity, and grounding
+Perform a continuity check and insulation resistance test on the main PV feeder at 101 Birch Road, confirm correct polarity at every connector, verify grounding conductor clamps are tight and bonded to the service ground, and record test values on the safety checklist before signing off.
The tools that do the workMicrosoft Exceljob descriptionsO*NET
Pasted it? Good. When the reply comes back, push once: ask it to sharpen the weakest part. — Did this prompt help?
Make2
Install solar panels
+Mount and align the 6-panel array on the south rafter at 89 Harbor Lane per the layout drawing, secure rail…
Install solar panels
+Mount and align the 6-panel array on the south rafter at 89 Harbor Lane per the layout drawing, secure rail attachments to the framed points, place modules, torque racking bolts to spec, connect mid clamps and end clamps, and leave a labelled commissioning checklist with the homeowner.
The tools that do the workWork schedulingESCOjob descriptions
Pasted it? Good. When the reply comes back, push once: ask it to sharpen the weakest part. — Did this prompt help?
Activate and test PV systems
+Bring meter, insulation tester, and clamp meter to 248 Pine Drive, energise the DC strings, verify…
Activate and test PV systems
+Bring meter, insulation tester, and clamp meter to 248 Pine Drive, energise the DC strings, verify open-circuit voltage and short-circuit current within expected ranges, test inverter startup and grid export, log readings and any fault codes, and confirm operation with the homeowner present.
The tools that do the workExtensible markup language XMLESCOjob descriptions
Pasted it? Good. When the reply comes back, push once: ask it to sharpen the weakest part. — Did this prompt help?
Keeping the record1
Apply weather sealant to equipment
+Apply manufacturer-approved silicone to all array junction boxes, weatherproof exposed conduit runs, reseal…
Apply weather sealant to equipment
+Apply manufacturer-approved silicone to all array junction boxes, weatherproof exposed conduit runs, reseal roof penetrations around the new conduit boot, and inspect for bead continuity and adhesion while roofs are still dry so warranty coverage remains intact.
The tools that do the workMicrosoft Wordjob descriptionsO*NET
Pasted it? Good. When the reply comes back, push once: ask it to sharpen the weakest part. — Did this prompt help?
The daily work16
Verify site measurements and design configurations
+Confirm the roof dimensions and panel layout on the As-Built plan against the site tape and laser readings,…
Verify site measurements and design configurations
+Confirm the roof dimensions and panel layout on the As-Built plan against the site tape and laser readings, note any overhangs, obstructions or shading, update the array tilt and stringing to match reality, then flag changes for procurement and the lead installer before Friday.
The tools that do the workMicrosoft Exceljob descriptions
Pasted it? Good. When the reply comes back, push once: ask it to sharpen the weakest part. — Did this prompt help?
Document installation process and compliance details
+Record each major step of the rooftop install on the compliance log: module serials, torque readings,…
Document installation process and compliance details
+Record each major step of the rooftop install on the compliance log: module serials, torque readings, grounding continuity, inverter model and commissioning results, attach photographs and the signed client checklist, and route the completed package to project controls today.
The tools that do the workMicrosoft WordMicrosoft Outlookjob descriptions
Pasted it? Good. When the reply comes back, push once: ask it to sharpen the weakest part. — Did this prompt help?
Perform routine system maintenance
+Run the scheduled quarterly maintenance: inspect combiner boxes, measure open-circuit and operating voltages,…
Perform routine system maintenance
+Run the scheduled quarterly maintenance: inspect combiner boxes, measure open-circuit and operating voltages, clean modules where soiling exceeds 5 percent, record belt and fastener wear, and submit the maintenance report with any recommended repairs within two business days.
The tools that do the workWork schedulingjob descriptions
Pasted it? Good. When the reply comes back, push once: ask it to sharpen the weakest part. — Did this prompt help?
Prepare the necessary fixtures
+Gather all mounting rails, flashing, lag bolts, mid and end clamps, rail spacers and grounding lugs for the…
Prepare the necessary fixtures
+Gather all mounting rails, flashing, lag bolts, mid and end clamps, rail spacers and grounding lugs for the Sunnydale rooftop job, verify quantities against the BOM and mark any missing items so the parts buyer can deliver them before the crew goes up tomorrow morning.
The tools that do the workCost estimatingESCO
Pasted it? Good. When the reply comes back, push once: ask it to sharpen the weakest part. — Did this prompt help?
Use measurement instruments
+Measure roof pitch, ridge spacing, eave-to-rake length, obstruction clearances and structural member…
Use measurement instruments
+Measure roof pitch, ridge spacing, eave-to-rake length, obstruction clearances and structural member locations with the inclinometer and tape, record each value on the site sheet and flag any readings outside the design limits to the structural engineer immediately.
Pasted it? Good. When the reply comes back, push once: ask it to sharpen the weakest part. — Did this prompt help?
Electrical wiring plans
+Lay out the single-line electrical drawing for the Rowan residence showing inverter location, AC disconnect,…
Electrical wiring plans
+Lay out the single-line electrical drawing for the Rowan residence showing inverter location, AC disconnect, meter, conduit runs and string combiner positions, verify conductor sizing against the site load table, then send the marked plan to the electrician for sign-off.
Pasted it? Good. When the reply comes back, push once: ask it to sharpen the weakest part. — Did this prompt help?
Interpret 2D plans
+Read the roof plan and single-line electrical diagram, mark roof obstructions and rafter positions, convert…
Interpret 2D plans
+Read the roof plan and single-line electrical diagram, mark roof obstructions and rafter positions, convert drawing measurements to on-site dimensions, list required module layout and conduit runs, and flag any clashes that would stop installation.
Pasted it? Good. When the reply comes back, push once: ask it to sharpen the weakest part. — Did this prompt help?
Follow safety procedures when working at heights
+Walk the roof using the fall-protection checklist, verify anchor points and clearances, note required harness…
Follow safety procedures when working at heights
+Walk the roof using the fall-protection checklist, verify anchor points and clearances, note required harness and ladder setups, record any hazards that change the plan, and confirm the team signs off before lifting panels.
Pasted it? Good. When the reply comes back, push once: ask it to sharpen the weakest part. — Did this prompt help?
Install module array interconnect wiring, implementing measures to disable arrays during installation.
+Install the module array interconnect wiring for the south roof array, lock out and visibly tag the solar…
Install module array interconnect wiring, implementing measures to disable arrays during installation.
+Install the module array interconnect wiring for the south roof array, lock out and visibly tag the solar combiner and inverter AC breaker before cutting any conductors, route and secure all conductors per the wiring plan, then verify isolation with a meter before continuing.
The tools that do the workWork schedulingO*NET
Pasted it? Good. When the reply comes back, push once: ask it to sharpen the weakest part. — Did this prompt help?
Install required labels on solar system components and hardware.
+Attach the required warning and equipment labels to each string junction box, module combiner, rapid shutdown…
Install required labels on solar system components and hardware.
+Attach the required warning and equipment labels to each string junction box, module combiner, rapid shutdown device, and inverter disconnect on the east and west arrays, place labels flush and visible from service access points, photograph each labeled item, and note serial numbers in the job folder.
The tools that do the workMicrosoft WordO*NET
Pasted it? Good. When the reply comes back, push once: ask it to sharpen the weakest part. — Did this prompt help?
Determine materials, equipment, and installation sequences necessary to maximize installation efficiency.
+Walk the site with the crew foreman, measure roof runs and inverter location, list the PV modules, racking,…
Determine materials, equipment, and installation sequences necessary to maximize installation efficiency.
+Walk the site with the crew foreman, measure roof runs and inverter location, list the PV modules, racking, conductors, conduit, combiner and hardware needed for the north and south arrays, then sequence tasks to keep one team on mounting while another preps wiring to shave two days off the schedule.
The tools that do the workCost estimatingWork schedulingO*NET
Pasted it? Good. When the reply comes back, push once: ask it to sharpen the weakest part. — Did this prompt help?
Program, adjust, or configure inverters and controls for desired set points and operating modes.
+Program the on-site string inverter to the site’s export limit, set MPPT tracking parameters and…
Program, adjust, or configure inverters and controls for desired set points and operating modes.
+Program the on-site string inverter to the site’s export limit, set MPPT tracking parameters and anti-islanding thresholds per the manufacturer startup sheet, log the firmware version and setpoints, then run an operational test and record DC/AC voltages and error codes.
The tools that do the workExtensible markup language XMLO*NET
Pasted it? Good. When the reply comes back, push once: ask it to sharpen the weakest part. — Did this prompt help?
Determine appropriate sizes, ratings, and locations for all system overcurrent devices, disconnect devices, grounding equipment, and surge suppression equipment.
+Review the single-line drawing and site plans, size and mark locations for the AC main disconnect, DC string…
Determine appropriate sizes, ratings, and locations for all system overcurrent devices, disconnect devices, grounding equipment, and surge suppression equipment.
+Review the single-line drawing and site plans, size and mark locations for the AC main disconnect, DC string fuses, grounding electrode conductor and surge protective devices, select device ratings to meet NEC and utility interconnect requirements, and annotate the plan for the electrician.
The tools that do the workMicrosoft ExcelO*NET
Pasted it? Good. When the reply comes back, push once: ask it to sharpen the weakest part. — Did this prompt help?
Compile or maintain records of system operation, performance, and maintenance.
+Create and maintain the system log: record daily operating hours, inverter alarms, string voltages,…
Compile or maintain records of system operation, performance, and maintenance.
+Create and maintain the system log: record daily operating hours, inverter alarms, string voltages, maintenance actions and inspection dates, attach meter snapshots and technician notes, and produce a monthly performance summary for the owner.
The tools that do the workMicrosoft ExcelO*NET
Pasted it? Good. When the reply comes back, push once: ask it to sharpen the weakest part. — Did this prompt help?
Work scheduling
+Update the work scheduling to book rooftop module install at 321 Harbor Drive for Friday 7am, assign crew…
Work scheduling
+Update the work scheduling to book rooftop module install at 321 Harbor Drive for Friday 7am, assign crew lead Marco, allocate two panels and racking kit, include grid-connection permit note and request morning site access confirmation.
The tools that do the workWork schedulingO*NET
Pasted it? Good. When the reply comes back, push once: ask it to sharpen the weakest part. — Did this prompt help?
Cost estimating
+Compile the one-line electrical layout, inverter sizing, tilt details and BOS pricing, produce the cost…
Cost estimating
+Compile the one-line electrical layout, inverter sizing, tilt details and BOS pricing, produce the cost estimating for the Westfield project, include expected energy yield and warranty assumptions for procurement review.
The tools that do the workCost estimatingO*NET
Pasted it? Good. When the reply comes back, push once: ask it to sharpen the weakest part. — Did this prompt help?
Says who?
These are the pages we read to build this. Open any of them and check us.
The logs, files & records this job keeps
Shared with other careers — the same record means something different in each.
Related careers
Same family of work — each with its own tasks and prompts.
The LLOS Work Atlas is the world's largest evidenced task library — a map of human work, with a ready prompt behind every task. 1,774 careers · every task named by the sources that witnessed it — O*NET, ESCO, real job descriptions, Wikipedia — and the deepest tasks by several at once. And it is honest about limits: where AI cannot help, the map says so.
The rest of the map
Same library, five ways in.
Copyright © LLOS.ai · 2026 — original pedagogy, voice, and design — all rights reserved.
Built on public evidence: O*NET®, ESCO, Wikipedia, U.S. Bureau of Labor Statistics, ILOSTAT. All sources & licenses
Built on public evidence: O*NET®, ESCO, Wikipedia, U.S. Bureau of Labor Statistics, ILOSTAT. All sources & licenses