Tiler

Tiler engages with clients and this page offers 20 real tasks that reveal communication patterns and relationship-building actions. Tasks show tone, timing, and how to document conversations. Each one shows where we found it, and comes with an AI prompt you can copy and use straight away.

20evidenced tasks
20ready prompts
9tools of the trade
47-2042.00O*NET-SOC code
23,640hold this job (US, BLS 2025)
$56,460median pay/yr (US)
Open Tiler in the interactive atlas →

What it pays

Government survey numbers — not estimates, not ads.

Half of all Floor Layers, Except Carpet, Wood, and Hard Tiles in the U.S. earn more than $56,460 a year — the middle 80% land between $37,600 and $96,700. About 23,640 people in the U.S. do this work. Figures are for the U.S. occupation group “Floor Layers, Except Carpet, Wood, and Hard Tiles”. (U.S. Bureau of Labor Statistics survey, published 2025.) In India, Craft and related trades workers earn about ₹16,825 a month on average — around ₹2.0 lakh a year (government PLFS survey via ILOSTAT, occupation-family figure).
$56,460typical pay / year
23,640people in this work
$96,700+top 10% earn
₹2.0 lakha year in India (family avg)
Think you get this job?Six quick questions on how it really works — with a hint and the reason behind every answer.
Test yourself →

The work, task by task

These are the real jobs-to-be-done, not a wish list. Each task shows where we found it, and the prompt underneath is written for that exact task.

Keeping the record1

Finish flooring edges and seams

+
Finish the floor by fitting and securing the last rows against skirting and door thresholds, trim and scribe…
Finish the floor by fitting and securing the last rows against skirting and door thresholds, trim and scribe each board for tight seams, sand any high spots, fill gaps with matching filler, and leave a clean, dust-free surface ready for seal on Friday.
The tools that do the workFlooring Technologies QFloorsjob descriptionsO*NET
The daily work19

Remove excess cement to clean finished surface.

+
Remove the excess cement from the finished tiled surface using a firm scraper and damp sponge so all grout…
Remove the excess cement from the finished tiled surface using a firm scraper and damp sponge so all grout lines and tile faces are smooth and free of residue, check edges for hollows, and vacuum the floor before final inspection.
The tools that do the workFlooring Technologies QFloorsO*NET

Trim excess covering materials, tack edges, and join sections of covering material to form tight joint.

+
Trim the excess covering at seams with a sharp straightedge, tack down edges so they lie flat, and stitch or…
Trim the excess covering at seams with a sharp straightedge, tack down edges so they lie flat, and stitch or seam-join adjacent sections to create a tight, even joint that will not lift under foot traffic.
The tools that do the workFocus Floor CoveringO*NET

Apply adhesive cement to floor or wall material to join and adhere foundation material.

+
Spread adhesive cement evenly over the substrate with the correct notched trowel, apply the floor or wall…
Spread adhesive cement evenly over the substrate with the correct notched trowel, apply the floor or wall covering into wet adhesive with proper pressure, and wipe excess before it skins to ensure full bond and clean edges.
The tools that do the workAya Associates Comp-U-FloorO*NET

Cut covering and foundation materials, according to blueprints and sketches.

+
Measure and cut covering and underlayment to the blueprint dimensions, mark pieces on the material, make…
Measure and cut covering and underlayment to the blueprint dimensions, mark pieces on the material, make ergonomic straight and compound cuts where needed, and dry-fit each piece to the layout before final placement.
The tools that do the workMeasure Square FloorEstimate ProO*NET

Determine traffic areas and decide location of seams.

+
Walk the site to map high-traffic zones, mark seam lines to fall away from doorways and along less visible…
Walk the site to map high-traffic zones, mark seam lines to fall away from doorways and along less visible runs, and decide seam placement so joints carry load sensibly and minimise wear in busiest corridors.
The tools that do the workProject visualizationO*NET

Disconnect and remove appliances, light fixtures, and worn floor and wall covering from floors, walls, and cabinets.

+
Disconnect and remove appliances and light fittings as needed, strip out worn floor and wall coverings…
Disconnect and remove appliances and light fittings as needed, strip out worn floor and wall coverings carefully to avoid damage to cabinets and wiring, and dispose of waste while preserving salvageable fixtures.
The tools that do the workOn Center On-Screen TakeoffO*NET

Heat and soften floor covering materials to patch cracks or fit floor coverings around irregular surfaces, using blowtorch.

+
Heat the affected vinyl and backing with the torch until pliable, press filler into the crack, trim and…
Heat the affected vinyl and backing with the torch until pliable, press filler into the crack, trim and smooth excess, cool and test bond, ensure surrounding timber and adhesives are protected and ventilated before leaving site.
The tools that do the workFlooring Technologies QFloorsO*NET

Apply shock-absorbing, sound-deadening, or decorative coverings

+
Lay the chosen underlay or acoustic membrane across the subfloor, cut and fit around door frames and pipes,…
Lay the chosen underlay or acoustic membrane across the subfloor, cut and fit around door frames and pipes, bond seams with recommended adhesive, roll the surface for contact, and check decorative finish runs straight to the main sightline.
The tools that do the workMeasure Square FloorEstimate Projob descriptions

Ensure proper alignment and adhesion of flooring

+
Dry-fit the first run of tiles or planks from the chosen datum, snap control lines, apply adhesive in small…
Dry-fit the first run of tiles or planks from the chosen datum, snap control lines, apply adhesive in small sections, bed units straight to line, tap joints for uniform grout gaps and check levels every metre before the adhesive skins.
The tools that do the workPacific Solutions FloorRightjob descriptions

Maintain and clean work area during installation

+
Sweep and vacuum the work area hourly, bag and remove offcuts, wipe adhesive spillages before they set, set…
Sweep and vacuum the work area hourly, bag and remove offcuts, wipe adhesive spillages before they set, set out a sealed debris bin and damp-mop at knock-off so tools and pathways stay safe for the crew and client.
The tools that do the workProject visualizationjob descriptions

Follow safety procedures and use protective equipment

+
Put on gloves, eye protection, respirator and knee pads, isolate heat and adhesive work with warning signs,…
Put on gloves, eye protection, respirator and knee pads, isolate heat and adhesive work with warning signs, confirm extinguisher and first-aid kit are at hand, and brief the crew on emergency shutdown before starting.
The tools that do the workRadio frequency identification RFIDjob descriptions

Prepare the surface

+
Strip loose material, sand and fill depressions, vacuum and solvent-wipe the subfloor, check moisture with a…
Strip loose material, sand and fill depressions, vacuum and solvent-wipe the subfloor, check moisture with a meter, apply primer where needed and leave to cure to the manufacturer’s specification before laying.
The tools that do the workAya Associates Comp-U-FloorESCO

Clean wood surface

+
Prepare the stair landing by removing loose dust and grit with a broom, sand high spots and edges until the…
Prepare the stair landing by removing loose dust and grit with a broom, sand high spots and edges until the surface is smooth to the touch, vacuum all sanding dust with a HEPA filter, then wipe down with a damp cloth and allow to dry before laying tile.
The tools that do the workAya Associates Comp-U-FloorESCOsee the evidence ↗

Cut parquet or board elements to size

+
Cut the parquet and board elements to the exact measured lengths for the living room run, mitre ends where…
Cut the parquet and board elements to the exact measured lengths for the living room run, mitre ends where the skirting meets, label each cut for its position, deburr edges and stack by row to avoid waste and rework.
The tools that do the workFlooring Technologies QFloorsESCO

Lay them in a predetermined pattern

+
Lay the cut tiles and boards in the herringbone pattern planned for the hallway, maintain 3 mm expansion…
Lay the cut tiles and boards in the herringbone pattern planned for the hallway, maintain 3 mm expansion gaps, stagger joints to the layout plan, check alignment with the chalk line every two rows and correct before adhesive sets.
The tools that do the workProject visualizationESCO

Work ergonomically

+
Set up the workstation and lifting aids, alternate kneeling and standing every 30 minutes, use knee pads and…
Set up the workstation and lifting aids, alternate kneeling and standing every 30 minutes, use knee pads and back brace when moving planks, take a five minute stretching break every hour and keep the work area tidy to reduce trips.
The tools that do the workMicrosoft OfficeESCOsee the evidence ↗

Follow health and safety procedures in construction

+
Follow the site safety plan: wear safety boots, eye protection, dust mask and hearing protection during…
Follow the site safety plan: wear safety boots, eye protection, dust mask and hearing protection during cutting, keep a dust extraction unit running, barricade the work area and log permits and incidents in the site safety book.
The tools that do the workProject visualizationESCOsee the evidence ↗

Create smooth wood surface

+
Prepare surfaces by sanding high spots and filling gaps, clean dust with a tack cloth, run a final pass with…
Prepare surfaces by sanding high spots and filling gaps, clean dust with a tack cloth, run a final pass with 180 grit for an even face, then inspect under daylight for grain tear-out before adhesive or finish.
The tools that do the workFlooring Technologies QFloorsESCOsee the evidence ↗

Focus floor covering

+
Enter measured tile layout, waste factor and labor hours into focus floor covering, attach photos of…
Enter measured tile layout, waste factor and labor hours into focus floor covering, attach photos of substrate condition, confirm grout color with client and set install start for Wednesday morning.
The tools that do the workFocus Floor CoveringO*NET

Says who?

These are the pages we read to build this. Open any of them and check us.

The logs, files & records this job keeps

Shared with other careers — the same record means something different in each.

Related careers

Same family of work — each with its own tasks and prompts.

The LLOS Work Atlas is the world's largest evidenced task library — a map of human work, with a ready prompt behind every task. 1,774 careers · every task named by the sources that witnessed it — O*NET, ESCO, real job descriptions, Wikipedia — and the deepest tasks by several at once. And it is honest about limits: where AI cannot help, the map says so.

The rest of the map

Same library, five ways in.

Copyright © LLOS.ai · 2026 — original pedagogy, voice, and design — all rights reserved.
Built on public evidence: O*NET®, ESCO, Wikipedia, U.S. Bureau of Labor Statistics, ILOSTAT. All sources & licenses