Asphalt Layer

Asphalt Layer is shown performing 20 tasks which together demonstrate the role’s workload and measurable effects. Tasks include stepwise instructions and pointers on using Time report. Each one shows where we found it, and comes with an AI prompt you can copy and use straight away.

20evidenced tasks
20ready prompts
7tools of the trade
47-2071.00O*NET-SOC code
41,820hold this job (US, BLS 2025)
$53,340median pay/yr (US)
Open Asphalt Layer in the interactive atlas →

What it pays

Government survey numbers — not estimates, not ads.

Half of all Paving, Surfacing, and Tamping Equipment Operators in the U.S. earn more than $53,340 a year — the middle 80% land between $38,230 and $92,230. About 41,820 people in the U.S. do this work. Figures are for the U.S. occupation group “Paving, Surfacing, and Tamping Equipment Operators”. (U.S. Bureau of Labor Statistics survey, published 2025.) In India, Craft and related trades workers earn about ₹16,825 a month on average — around ₹2.0 lakh a year (government PLFS survey via ILOSTAT, occupation-family figure).
$53,340typical pay / year
41,820people in this work
$92,230+top 10% earn
₹2.0 lakha year in India (family avg)
Think you get this job?Six quick questions on how it really works — with a hint and the reason behind every answer.
Test yourself →

The work, task by task

These are the real jobs-to-be-done, not a wish list. Each task shows where we found it, and the prompt underneath is written for that exact task.

Fixing3

Operate tamping machines or manually roll surfaces

+
Compact the fresh asphalt with the vibratory tamper across the eastbound lane after we lay the binder, keep…
Compact the fresh asphalt with the vibratory tamper across the eastbound lane after we lay the binder, keep the plate overlapping each pass by half its width, check surface temperature every 10 minutes, and stop if any seam shows visible segregation.
The tools that do the workTime reportjob descriptionsO*NET

Set up and tear down equipment.

+
Set up the day shift’s equipment zone at the north staging area, erect the safety cones and signage to close…
Set up the day shift’s equipment zone at the north staging area, erect the safety cones and signage to close two lanes, position the paver, dump hopper, rollers and fuel drum, then record dismantling steps and missing parts before leaving at 18:00.
The tools that do the workWarehouse management system WMSjob descriptionsO*NET

Start machine, engage clutch, and push levers to guide operation

+
Start the roller, warm the engine to operating temperature, engage the drive clutch and select low speed,…
Start the roller, warm the engine to operating temperature, engage the drive clutch and select low speed, then guide the steering and vibration levers to compact the mat in overlapping passes while briefing the flagger on any slow zones.
The tools that do the workTime reportjob descriptionsO*NET
Coordinate1

Control traffic.

+
Control traffic for the resurfacing on Maple Avenue: deploy two flaggers at each end with handheld stop/slow…
Control traffic for the resurfacing on Maple Avenue: deploy two flaggers at each end with handheld stop/slow signs, radio the crew about 15-minute single-lane closures, log any near-miss or delay, and reopen both lanes by 17:30.
The tools that do the workMicrosoft Officejob descriptionsO*NET
The daily work16

Coordinate construction activities

+
Schedule paving, milling, and compaction so crews, paver, milling machine and rollers arrive in the right…
Schedule paving, milling, and compaction so crews, paver, milling machine and rollers arrive in the right sequence tomorrow; confirm material delivery times, concrete truck access, and who will flag traffic before work starts.
The tools that do the workMicrosoft ExcelESCOsee the evidence ↗

Evaluate employees work

+
Walk the section we paved yesterday, note each crew member’s productivity and any defects, record hours and…
Walk the section we paved yesterday, note each crew member’s productivity and any defects, record hours and punchlist items, and prepare short feedback for crew leads and payroll before the end of the day.
The tools that do the workTime reportESCOsee the evidence ↗

Mechanical systems

+
Inspect the paver, screed, hopper, and roller hydraulics now, list required adjustments or parts, estimate…
Inspect the paver, screed, hopper, and roller hydraulics now, list required adjustments or parts, estimate downtime and who will fix it, then brief the mechanic and crew so repairs happen during the next material laydown.
The tools that do the workWarehouse management system WMSESCOsee the evidence ↗

Manage health and safety standards

+
Review the site safety walkthrough, update the toolbox talk with today’s dust, heat and traffic hazards,…
Review the site safety walkthrough, update the toolbox talk with today’s dust, heat and traffic hazards, assign safety observers for each shift, and send the revised plan to the office before shift handover.
The tools that do the workMicrosoft OfficeMicrosoft OutlookESCOsee the evidence ↗

Supervise staff

+
Hold the morning briefing, assign tasks and working zones, confirm break rotations and backup operators, note…
Hold the morning briefing, assign tasks and working zones, confirm break rotations and backup operators, note any performance issues, and tell leads who covers lunches so production stays steady.
The tools that do the workMicrosoft OutlookESCOsee the evidence ↗

Secure working area

+
Set up restricted work perimeter with cones, signs and flaggers, confirm vehicle access routes and emergency…
Set up restricted work perimeter with cones, signs and flaggers, confirm vehicle access routes and emergency exit, log who installed barriers and take photos before paving starts.
The tools that do the workMicrosoft OfficeESCOsee the evidence ↗

Coordinate truck dumping.

+
Coordinate truck dumping for the Main Street resurfacing: confirm three trucks will arrive between…
Coordinate truck dumping for the Main Street resurfacing: confirm three trucks will arrive between 07:00–09:00, stage them at the south gate, assign two flaggers and one spotter, hold dumping until rollers clear the pour area, and call me if timing slips.
The tools that do the workWarehouse management system WMSO*NET

Shovel blacktop.

+
Shovel blacktop along the east gutter from Station 12+00 to 12+80, keep a consistent crown, check thickness…
Shovel blacktop along the east gutter from Station 12+00 to 12+80, keep a consistent crown, check thickness with the gauge every 10 feet, rotate crews every 20 minutes, and stop work if material temperature drops below spec.
The tools that do the workTime reportO*NET

Operate oil distributors, loaders, chip spreaders, dump trucks, and snow plows.

+
Operate the oil distributor, loader, chip spreader and dump truck in sequence for the seal coat at Pine…
Operate the oil distributor, loader, chip spreader and dump truck in sequence for the seal coat at Pine Avenue: heat the distributor to target temp, keep loader ready to feed, coordinate speed with the chip spreader operator, and sweep excess chips immediately after pass.
The tools that do the workHCSS HeavyBidO*NET

Install dies, cutters, and extensions to screeds onto machines, using hand tools.

+
Install dies, cutters, and screed extensions on the paver before the morning shift: verify part numbers…
Install dies, cutters, and screed extensions on the paver before the morning shift: verify part numbers against the job spec, torque fasteners to spec, test run the screed for even plate travel, and sign off with the lead mechanic when done.
The tools that do the workTime reportO*NET

Set up forms and lay out guidelines for curbs, according to written specifications, using string, spray paint, and concrete or water mixes.

+
Set up curb forms and layout guidelines for the new sidewalk: snap string lines to the plans from Station…
Set up curb forms and layout guidelines for the new sidewalk: snap string lines to the plans from Station 5+20 to 6+60, mark offsets with spray paint, mix concrete/water to spec, brace forms for 3 foot heights, and inspect before pour time.
The tools that do the workAutodesk AutoCAD Civil 3DO*NET

Regulate screed temperatures and asphalt flow rates

+
Regulate screed temperatures and asphalt flow rates during the 10:00 paving pass: hold screed at target…
Regulate screed temperatures and asphalt flow rates during the 10:00 paving pass: hold screed at target temperature, adjust feeder gates to maintain a steady mat, monitor surface finish, and log any deviations for quality control.
The tools that do the workMicrosoft Exceljob descriptions

Process incoming construction supplies

+
Process the incoming pallet of binder, tack coat, and aggregate deliveries: confirm quantities against the…
Process the incoming pallet of binder, tack coat, and aggregate deliveries: confirm quantities against the purchase order, inspect for contamination or damage, log received items on the warehouse receipt, tag any rejects, and notify procurement and the foreman by today if shortages appear.
The tools that do the workWarehouse management system WMSESCOsee the evidence ↗

Ensure equipment availability

+
Check the paver, roller, and dump truck availability for Monday: verify fuel and hydraulic fluid levels,…
Check the paver, roller, and dump truck availability for Monday: verify fuel and hydraulic fluid levels, confirm scheduled maintenance is complete, flag any machines needing parts or service, and reassign operators so no lane paving is delayed.
The tools that do the workTime reportESCOsee the evidence ↗

Road traffic laws

+
Review the traffic control requirements for the Elm Street resurfacing shift: list applicable speed limits…
Review the traffic control requirements for the Elm Street resurfacing shift: list applicable speed limits and lane closure rules, ensure flagger qualifications meet the city code, update the traffic management sheet and tell the crew lead which signs and cones to place before the 07:00 start.
The tools that do the workMicrosoft OfficeESCOsee the evidence ↗

Work in a construction team

+
Prepare the crew briefing for tomorrow's three-person resurfacing team: assign roles for paver, roller, and…
Prepare the crew briefing for tomorrow's three-person resurfacing team: assign roles for paver, roller, and hopper operator, outline spill response and heat-safety steps, list quality checks for mat temperature and joint alignment, and circulate the sheet to the foreman and safety officer.
The tools that do the workMicrosoft OutlookESCOsee the evidence ↗

Says who?

These are the pages we read to build this. Open any of them and check us.

Activities this job lives in

The human activities behind the tasks — each with its honest AI ceiling.

The logs, files & records this job keeps

Shared with other careers — the same record means something different in each.

Related careers

Same family of work — each with its own tasks and prompts.

The LLOS Work Atlas is the world's largest evidenced task library — a map of human work, with a ready prompt behind every task. 1,774 careers · every task named by the sources that witnessed it — O*NET, ESCO, real job descriptions, Wikipedia — and the deepest tasks by several at once. And it is honest about limits: where AI cannot help, the map says so.

The rest of the map

Same library, five ways in.

Copyright © LLOS.ai · 2026 — original pedagogy, voice, and design — all rights reserved.
Built on public evidence: O*NET®, ESCO, Wikipedia, U.S. Bureau of Labor Statistics, ILOSTAT. All sources & licenses