Handyman

Handyman navigates daily challenges and these 21 real tasks spotlight the problems you’ll solve most often. You’ll learn the usual signals of trouble and which people benefit from your work. Each one shows where we found it, and comes with an AI prompt you can copy and use straight away.

21evidenced tasks
21ready prompts
7tools of the trade
49-9041.00O*NET-SOC code
439,640hold this job (US, BLS 2025)
$64,520median pay/yr (US)
Open Handyman in the interactive atlas →

What it pays

Government survey numbers — not estimates, not ads.

Half of all Industrial Machinery Mechanics in the U.S. earn more than $64,520 a year — the middle 80% land between $46,120 and $95,170. About 439,640 people in the U.S. do this work. Figures are for the U.S. occupation group “Industrial Machinery Mechanics”. (U.S. Bureau of Labor Statistics survey, published 2025.) In India, Craft and related trades workers earn about ₹16,825 a month on average — around ₹2.0 lakh a year (government PLFS survey via ILOSTAT, occupation-family figure).
$64,520typical pay / year
439,640people in this work
$95,170+top 10% earn
₹2.0 lakha year in India (family avg)
Think you get this job?Six quick questions on how it really works — with a hint and the reason behind every answer.
Test yourself →

The work, task by task

These are the real jobs-to-be-done, not a wish list. Each task shows where we found it, and the prompt underneath is written for that exact task.

Make1

Install industrial machinery and equipment

+
Install the new gear reducer and safety guarding on Line 2, bolt to the floor to factory torque, connect the…
Install the new gear reducer and safety guarding on Line 2, bolt to the floor to factory torque, connect the motor wiring per the provided single-line, pressure-test the hydraulic feed, commission with a one-hour no-load run and sign the install record.
The tools that do the workMaintenance planning and controlESCOjob descriptionsO*NET
Analysing2

Disassemble machinery for troubleshooting

+
Strip down the conveyor head at Bay B for diagnosis, tag and bag each fastener and sensor, log shaft and…
Strip down the conveyor head at Bay B for diagnosis, tag and bag each fastener and sensor, log shaft and bearing clearances, photograph the drive train layout, then reassemble only after root-cause is confirmed and parts are staged.
The tools that do the workMaintenance managementESCOjob descriptionsO*NET

Weld machinery parts as needed

+
Weld the cracked mount on the press platen using suitable filler, grind and dress to original profile, then…
Weld the cracked mount on the press platen using suitable filler, grind and dress to original profile, then perform a dye-penetrant check and load test to factory tolerance before returning the press to production.
The tools that do the workMaintenance managementESCOjob descriptions
Fixing1

Perform maintenance and repair

+
Complete the weekly maintenance on Pump A: change seals, replace worn hoses, torque motor terminals to spec,…
Complete the weekly maintenance on Pump A: change seals, replace worn hoses, torque motor terminals to spec, bleed the system, verify pressure and flow, and file the repair log with parts used and time spent.
The tools that do the workMaintenance planning and controlESCOO*NET
Learning1

Read technical manuals to understand equipment

+
Study the binder for the palletiser controls, map the sensor inputs and motor ratings onto the plant…
Study the binder for the palletiser controls, map the sensor inputs and motor ratings onto the plant single-line, note any discrepancies for electrical, and write a short action list for the procurement lead before tomorrow's shift meeting.
The tools that do the workMicrosoft Wordjob descriptionsO*NET
The daily work16

Record parts or materials used and order or requisition new parts or materials, as necessary.

+
Log parts and materials used on the conveyor motor rebuild, record quantities and condition, then raise a…
Log parts and materials used on the conveyor motor rebuild, record quantities and condition, then raise a requisition for replacement bearings and seal kits so stock is replenished before the next scheduled shutdown.
The tools that do the workInventory trackingO*NET

Demonstrate equipment functions and features to machine operators.

+
Run a hands-on demo of the new hydraulic press for the night shift operators on Thursday at 07:30, show safe…
Run a hands-on demo of the new hydraulic press for the night shift operators on Thursday at 07:30, show safe start-up, teach the two-step emergency stop and the routine lubrication points, and collect signatures confirming competency.
The tools that do the workMaintenance managementO*NET

Assign schedules to work crews.

+
Create the two-week crew rota assigning Jose, Maria and Lee to morning maintenance rounds, Marc and Tina to…
Create the two-week crew rota assigning Jose, Maria and Lee to morning maintenance rounds, Marc and Tina to evenings for breakdown cover, include planned preventive tasks and note who is on call each weekend.
The tools that do the workMaintenance planning and controlO*NET

Use diagnostic equipment to identify issues

+
Run diagnostics on Pump A using the vibration meter and thermal camera, record fault codes and waveform…
Run diagnostics on Pump A using the vibration meter and thermal camera, record fault codes and waveform screenshots, identify whether the issue is misalignment or bearing failure, and recommend next actions with estimated parts and downtime.
The tools that do the workKEYENCE PLC Ladder Logicjob descriptions

Use hand tools, lathes, grinders, drill presses

+
Turn the turret lathe and grinder to remake the worn coupling, mill the face to 0.02mm runout, deburr and…
Turn the turret lathe and grinder to remake the worn coupling, mill the face to 0.02mm runout, deburr and harden the part, then log the fabrication steps and install the new coupling on Line 2 during the next planned window.
The tools that do the workBIT Corp ProMACS PLCjob descriptions

Inspect industrial equipment

+
Perform a walkaround inspection of Press Station 3, test electrical connections, check hydraulic pressure and…
Perform a walkaround inspection of Press Station 3, test electrical connections, check hydraulic pressure and hose condition, note measurements and any anomalies in the maintenance log, and flag any item needing immediate repair.
The tools that do the workMaintenance managementESCOsee the evidence ↗

Resolve equipment malfunctions

+
Diagnose the persistent motor overheating on press line B, isolate and test the thermal cutout and bearings,…
Diagnose the persistent motor overheating on press line B, isolate and test the thermal cutout and bearings, replace the faulty capacitor and damaged wiring, run the motor at no-load for 30 minutes to confirm temperature stabilises, then log the repair in the maintenance record and notify production lead Sonia.
The tools that do the workMaintenance managementESCOsee the evidence ↗

Perform test run

+
Run the conveyor test sequence for shift change: inspect belts and guards, start the sequence at slow speed,…
Run the conveyor test sequence for shift change: inspect belts and guards, start the sequence at slow speed, gradually ramp to full operational speed while monitoring vibration and hydraulic pressure gauges, note any abnormal readings, stop and tag any fault for follow-up, then enter pass/fail and readings into the test log and tell supervisor Marco the results.
The tools that do the workMaintenance planning and controlESCOsee the evidence ↗

Work on new machinery and equipment in operation

+
Commission the new hydraulic press: check electrical wiring plans and tighten connections, bleed and…
Commission the new hydraulic press: check electrical wiring plans and tighten connections, bleed and pressurise the hydraulic circuits, run three short production cycles under supervision of operations lead Elena, verify safety interlocks and cycle timings, record setup parameters and any adjustments in the installation report, then hand over to production with a signed checklist.
The tools that do the workMaintenance managementMaintenance planning and controlESCOsee the evidence ↗

Perform maintenance on installed equipment

+
Perform maintenance on the installed conveyor motor in Bay 3 tonight: isolate power, replace the worn bearing…
Perform maintenance on the installed conveyor motor in Bay 3 tonight: isolate power, replace the worn bearing and seal, torque fasteners to spec, test run under load for 15 minutes and record readings in the equipment log before 07:00 tomorrow.
The tools that do the workMaintenance managementESCOsee the evidence ↗

Write records for repairs

+
Write a clear repair record for the lathe headstock fix done today: list fault, parts replaced (bearing 6205,…
Write a clear repair record for the lathe headstock fix done today: list fault, parts replaced (bearing 6205, gasket), start and finish times, tests performed, who signed off and next recommended inspection in 3 months.
The tools that do the workMicrosoft WordESCOsee the evidence ↗

Electrical wiring plans

+
Draw the electrical wiring plan for the new pump installation at Tank 2 showing supply feed, fused isolator,…
Draw the electrical wiring plan for the new pump installation at Tank 2 showing supply feed, fused isolator, motor starter wiring, cable routes with lengths and conduit sizes, and a one-line diagram for maintenance reference.
The tools that do the workMicrosoft OfficeESCOsee the evidence ↗

Secure working area

+
Secure the working area around Press 1 before repairs: lock out and tag the power, rope off the floor, post a…
Secure the working area around Press 1 before repairs: lock out and tag the power, rope off the floor, post a safety notice for operators, remove trip hazards, and log the isolation in the site safety book.
The tools that do the workMaintenance planning and controlESCOsee the evidence ↗

Conduct routine machinery checks

+
Conduct routine machinery checks on the packaging line this morning: inspect belts, check bearing…
Conduct routine machinery checks on the packaging line this morning: inspect belts, check bearing temperatures, verify lubrication points, note any unusual vibration, and submit a checklist with photos to maintenance by noon.
The tools that do the workInventory trackingESCOsee the evidence ↗

Inventory tracking

+
Log parts used, new purchases, and surplus tools into inventory tracking for Building B repairs this week,…
Log parts used, new purchases, and surplus tools into inventory tracking for Building B repairs this week, note vendor, cost, and location on each line, and schedule a reorder for broken locksets before Friday.
The tools that do the workInventory trackingO*NET

Inventory tracking

+
Log parts used on the three March 22 repairs, note returned surplus items, then update the inventory tracking…
Log parts used on the three March 22 repairs, note returned surplus items, then update the inventory tracking for Building B supplies and create a purchase suggestion for anything below two units.
The tools that do the workInventory trackingO*NET

Says who?

These are the pages we read to build this. Open any of them and check us.

Activities this job lives in

The human activities behind the tasks — each with its honest AI ceiling.

The logs, files & records this job keeps

Shared with other careers — the same record means something different in each.

Related careers

Same family of work — each with its own tasks and prompts.

The LLOS Work Atlas is the world's largest evidenced task library — a map of human work, with a ready prompt behind every task. 1,774 careers · every task named by the sources that witnessed it — O*NET, ESCO, real job descriptions, Wikipedia — and the deepest tasks by several at once. And it is honest about limits: where AI cannot help, the map says so.

The rest of the map

Same library, five ways in.

Copyright © LLOS.ai · 2026 — original pedagogy, voice, and design — all rights reserved.
Built on public evidence: O*NET®, ESCO, Wikipedia, U.S. Bureau of Labor Statistics, ILOSTAT. All sources & licenses