Mechanic carries out assessment tasks and these 17 real tasks break down how to evaluate needs and plan next steps. The entries clarify what evidence to collect and how to report it. Each one shows where we found it, and comes with an AI prompt you can copy and use straight away.

17evidenced tasks
17ready prompts
5tools of the trade
49-3042.00O*NET-SOC code
176,600hold this job (US, BLS 2025)
$65,510median pay/yr (US)
Open Mechanic in the interactive atlas →

What it pays

Government survey numbers — not estimates, not ads.

Half of all Mobile Heavy Equipment Mechanics, Except Engines in the U.S. earn more than $65,510 a year — the middle 80% land between $46,820 and $94,460. About 176,600 people in the U.S. do this work. Figures are for the U.S. occupation group “Mobile Heavy Equipment Mechanics, Except Engines”. (U.S. Bureau of Labor Statistics survey, published 2025.) In India, Craft and related trades workers earn about ₹16,825 a month on average — around ₹2.0 lakh a year (government PLFS survey via ILOSTAT, occupation-family figure).
$65,510typical pay / year
176,600people in this work
$94,460+top 10% earn
₹2.0 lakha year in India (family avg)
Think you get this job?Six quick questions on how it really works — with a hint and the reason behind every answer.
Test yourself →

The work, task by task

These are the real jobs-to-be-done, not a wish list. Each task shows where we found it, and the prompt underneath is written for that exact task.

Fixing3

Operate and inspect heavy equipment

+
Start the pre-shift heavy gear inspection on the 793 haul truck: complete walkaround checklist, record fluid…
Start the pre-shift heavy gear inspection on the 793 haul truck: complete walkaround checklist, record fluid levels and tyre pressures, run the engine warm-up checks, test hydraulic functions under light load, note any abnormal readings, and sign off if all green by 06:30.
The tools that do the workMaintenance managementRecordkeepingjob descriptionsO*NET

Diagnose equipment defects

+
Trace the source of the boom oscillation on the 772 excavator: reproduce the fault under controlled lift, log…
Trace the source of the boom oscillation on the 772 excavator: reproduce the fault under controlled lift, log vibration data, strip down the linkage to inspect pins and bushings, swap suspected components with the spare boom, and update the defect report with findings and recommended repair hours.
The tools that do the workFleet managementjob descriptionsO*NET

Repair damaged or worn parts

+
Repair the worn final drive on haul truck 789: remove the wheel assembly, replace the damaged gear and…
Repair the worn final drive on haul truck 789: remove the wheel assembly, replace the damaged gear and bearings with parts from bay B3, check shaft runout, refill to spec, torque to chart, test under no‑load and light‑load, then close the work order and attach parts used and labour time.
The tools that do the workMaintenance managementRecordkeepingjob descriptionsO*NET
Keeping the record1

Read operating manuals and technical drawings

+
Work through the operator manual and technical drawing set for the new jaw crusher: verify service intervals,…
Work through the operator manual and technical drawing set for the new jaw crusher: verify service intervals, note torque specs and hydraulic line routing, mark critical lift points and safety limits, photograph unclear sections, and produce a one‑page safe‑work summary for the crew toolbox talk.
The tools that do the workMicrosoft Wordjob descriptionsO*NET
The daily work13

Adjust and maintain industrial machinery, using control and regulating devices.

+
Adjust the conveyor drive regulators on the No.3 crusher, set control parameters to maintain 1200 rpm under…
Adjust the conveyor drive regulators on the No.3 crusher, set control parameters to maintain 1200 rpm under load, log the changes in the maintenance register, and run a 30-minute load test to confirm stable operation.
The tools that do the workMaintenance managementO*NET

Clean parts by spraying them with grease solvent or immersing them in tanks of solvent.

+
Degrease the hydraulic pump covers and gearbox housings by spraying solvent, then immerse removable bearings…
Degrease the hydraulic pump covers and gearbox housings by spraying solvent, then immerse removable bearings in the solvent tank, inspect for pitting, dry and re-lubricate before returning parts to the No.2 haul truck.
The tools that do the workRecordkeepingO*NET

Troubleshoot mechanical issues

+
Diagnose the JCB loader vibration by road-testing at idle and full throttle, isolating source to either loose…
Diagnose the JCB loader vibration by road-testing at idle and full throttle, isolating source to either loose coupling, bent shaft, or bearing wear, document fault codes and recommended repairs for the service planner.
The tools that do the workMaintenance managementjob descriptions

Handle and move objects

+
Lift and position the 600 kg gearbox from stock to the service bay with the overhead hoist, secure on the…
Lift and position the 600 kg gearbox from stock to the service bay with the overhead hoist, secure on the bench, tag orientation and mounting points, then move the old unit to the disposal pallet for return to stores.
The tools that do the workFleet managementjob descriptions

Make decisions and solve problems

+
Decide whether to repair or replace the worn bearing set on the primary mill by comparing downtime cost for a…
Decide whether to repair or replace the worn bearing set on the primary mill by comparing downtime cost for a six-hour repair versus a 24-hour replacement, consult with operations lead Sarah, then record the chosen action and rationale in the maintenance log.
The tools that do the workRecordkeepingjob descriptions

Install mining machinery

+
Install the replacement feeder motor at Bay 4, align coupling to shaft tolerances, torque mount bolts to…
Install the replacement feeder motor at Bay 4, align coupling to shaft tolerances, torque mount bolts to spec, wire incoming power to the motor starter, test run under load and update the installation certificate and asset history.
The tools that do the workMaintenance managementESCOsee the evidence ↗

Maintain mine machinery

+
Service the 785 haul truck and two rock drills this week: complete lubrication, replace the worn hydraulic…
Service the 785 haul truck and two rock drills this week: complete lubrication, replace the worn hydraulic hoses on the right boom, test run both units for 2 hours, and update the service log before Friday shift change.
The tools that do the workMaintenance managementESCOsee the evidence ↗

Test mine equipment

+
Run full functional tests on the conveyor drive and the primary crusher tomorrow morning: record vibration…
Run full functional tests on the conveyor drive and the primary crusher tomorrow morning: record vibration and temperature readings every 15 minutes, isolate any fault codes, and hand the signed test sheet to Shift Supervisor by 14:00.
The tools that do the workRecordkeepingESCOsee the evidence ↗

Train operators in using mine machinery

+
Run a two-hour hands-on course for the night crew on loader start-up and emergency shutdown, demonstrate the…
Run a two-hour hands-on course for the night crew on loader start-up and emergency shutdown, demonstrate the daily safety checklist, have each operator complete the checklist under supervision, then file attendance and competency notes after the shift.
The tools that do the workFleet managementRecordkeepingESCOsee the evidence ↗

Mechanical mine machinery manuals

+
Draft updated mechanical service manuals for the drill rigs: include the step-by-step hose replacement,…
Draft updated mechanical service manuals for the drill rigs: include the step-by-step hose replacement, torque settings, and safety lockout procedure, then send the draft to Engineering and Safety Officer for review by Wednesday.
The tools that do the workMicrosoft WordESCOsee the evidence ↗

Communicate mine equipment information

+
Prepare a one-page bulletin for site teams detailing the recent gearbox fault trend, required pre-shift…
Prepare a one-page bulletin for site teams detailing the recent gearbox fault trend, required pre-shift checks, and parts on order, then distribute it to Supervisors and pin copies on the noticeboard before first break.
The tools that do the workMicrosoft OutlookESCOsee the evidence ↗

Conduct inter-shift communication

+
Prepare the inter-shift handover noting current status of drill rig DR-3: coolant topped, belt tension low,…
Prepare the inter-shift handover noting current status of drill rig DR-3: coolant topped, belt tension low, tyre pressures 82 psi front, pending parts for starter motor — flag safety hold until starter arrives and notify Night Shift Lead Marco and Shift Manager Isabel before 06:30.
The tools that do the workRecordkeepingMicrosoft OutlookESCOsee the evidence ↗

Adjust mobile mechanical systems

+
Log and apply adjustments to the haul truck suspension valve to reduce rear roll on corners, record…
Log and apply adjustments to the haul truck suspension valve to reduce rear roll on corners, record before-and-after ride height, torque settings, custom shim used, test run results at 15 km/h, and update the vehicle maintenance file and operator on completion.
The tools that do the workFleet managementjob descriptionssee the evidence ↗

Says who?

These are the pages we read to build this. Open any of them and check us.

Activities this job lives in

The human activities behind the tasks — each with its honest AI ceiling.

The logs, files & records this job keeps

Shared with other careers — the same record means something different in each.

Related careers

Same family of work — each with its own tasks and prompts.

The LLOS Work Atlas is the world's largest evidenced task library — a map of human work, with a ready prompt behind every task. 1,774 careers · every task named by the sources that witnessed it — O*NET, ESCO, real job descriptions, Wikipedia — and the deepest tasks by several at once. And it is honest about limits: where AI cannot help, the map says so.

The rest of the map

Same library, five ways in.

Copyright © LLOS.ai · 2026 — original pedagogy, voice, and design — all rights reserved.
Built on public evidence: O*NET®, ESCO, Wikipedia, U.S. Bureau of Labor Statistics, ILOSTAT. All sources & licenses